12
Belt Wrap & Assembly
1. Remove pan sides and bottom from tail end.
2. Using belt puller, feed belt through conveyor as shown.
Hand feed belt from tail end toward other end of belt.
3. Clamp belt stretcher plates on ends of belt, leaving 2 to
3 feet between stretcher plates. Plates should be bolted
tight enough to avoid belt slipping.
4. Use a device (for example- come-along) to pull belt
ends together.
5. Insert cable through belt splice.
Summary of Contents for BeltVeyor Crescent
Page 1: ...BeltVeyor 16 Honeycomb Crescent Owner s Manual 04149100 2012 ...
Page 12: ...10 Dimensions ...
Page 13: ...11 Winch Wrap Diagram 20 30 Cable Mount Diagram 40 50 70 ...
Page 19: ...17 BeltVeyor Repair Parts Tubes 10 Half Band 10319210 ...
Page 22: ...20 20 BeltVeyor Electric Head Tail and Pan ...
Page 24: ...22 20 BeltVeyor Electric Conveyor Parts ...
Page 26: ...24 20 BeltVeyor Electric Drive and Undercarriage ...
Page 28: ...26 20 BeltVeyor Hydraulic Head Tail and Pan ...
Page 30: ...28 20 BeltVeyor Hydraulic Conveyor Parts ...
Page 32: ...30 20 BeltVeyor Hydraulic Drive and Undercarriage ...
Page 34: ...32 ...
Page 36: ...34 30 BeltVeyor Electric Head Tail and Pan ...
Page 38: ...36 30 BeltVeyor Electric Conveyor Parts ...
Page 40: ...38 30 BeltVeyor Electric Drive and Undercarriage ...
Page 42: ...40 30 BeltVeyor Hydraulic Head Tail and Pan ...
Page 44: ...42 30 BeltVeyor Hydraulic Conveyor Parts ...
Page 46: ...44 30 BeltVeyor Hydraulic Drive and Undercarriage ...
Page 48: ...46 ...