In-Wall Docking Station for iPad
®
Crestron
IDOC-PAD-DSWC
Install the Dock
NOTE
: Before inserting the IDOC-PAD-DSWC in the mounting hole, ensure that a
cable that is capable of supplying the required power has been installed in the wall.
NOTE:
If a PMK-IDOC-PAD-DSW is to be used, refer to the latest version of the
PMK-IDOC-PAD-DSW Installation Guide (Doc. 7088) which is available from the
Crestron Web site.
1.
Install the four supplied #6-AB x 2-1/2” screws and mounting clips as
shown in the following diagram (two on the top and two on the bottom).
a.
Insert the screws through the docking station’s flange and then through
the larger hole in the mounting clip.
b.
Thread the screws through the smaller hole in the mounting clips and
tighten the screws only enough that the mounting clips are brought
flush with the rear of the docking station’s flange. Do not compress the
mounting clips at this time.
Attaching the Screws and Mounting Clips
Thread Screws Through
Clips At This End
Mounting Clips
Mounting Screws
(4) 6-AB X 2-1/2"
(2014276)
2.
Using the supplied connector, connect the 24 VDC cable, to the
POWER
INPUT
24 VDC
port and position the IDOC-PAD-DSWC in the mounting
hole. Refer to “Hardware Hookup” which starts on page 9.
3.
Tighten the mounting screws evenly and only enough to compress the
mounting clips and secure the IDOC-PAD-DSWC squarely in the mounting
surface. Do not over-tighten the screws.
8
•
In-Wall Docking Station for iPad
®
: IDOC-PAD-DSWC
Operations & Installation Guide – DOC. 7084A
Summary of Contents for IDOC-PAD-DSWC
Page 4: ......