HARdWARe bAG ContentS

ASSeMbly HARdWARe:

 

(dRAWinGS noT To SCALe - iLLuSTRATionS ARe RePReSenTATive oF hARdWARe)

We have packaged more hardware than is required for assembly.

50350-700 

Hardware bag - Skybox 2005 - SP

52 

17001-105 

Weld nut - 5/16"-18

52 

12017-206 

Lock Washer - 5/16"

62 

12002-206 

Flat Washer - 5/16"

17003-611 

hex bolt - 5/16 x 1-1/2"

17003-811 

hex bolt - 5/16 x 2"

17003-1011 

hex bolt - 5/16 x 2-1/2"

33 

17003-1611 

hex bolt - 5/16 x 4"

17003-2211 

hex bolt - 5/16 x 5-1/2"

17003-2411 

hex bolt - 5/16 x 6"

105 

17020-106 

Screw - #8 x 1-5/8"

70 

17020-112 

Screw - #8 x 2"

18 

17020-109 

Screw - #8 x 2-1/2"

17036-1202 

Lag Screw - 5/16 x 3"

17036-1602 

Lag Screw - 5/16 x 4"

17036-2002 

Lag Screw - 5/16 x 5"

14161-400 

Access Ladder bracket

5/16" Hex bolt

lag Screw

flat Head Wood Screw

5/16" flat Washer

5/16" lock Washer

5/16" Weld nut

1" Hole Cap

Access ladder 

bracket

52 

15081-704 

hole Cap 1", brown

Summary of Contents for PINE SKYBOX SH901-700

Page 1: ...with the assembly or use of your new play set Creative Playthings takes great care to design its products with your child s safety in mind However only with careful supervision and proper safety instr...

Page 2: ...rical devices or bird feeders etc Suspended ropes chains and cables must be secured at both ends Suspended ropes chains and cables must not be capable of looping back on themselves Do not allow more t...

Page 3: ...lean or rack This leaning puts additional stress on all connections and joints and in time will cause those connections to loosen and fail The Safe Play Area must be free of all structures landscapin...

Page 4: ...r 5 16 2 17003 611 Hex Bolt 5 16 x 1 1 2 4 17003 811 Hex Bolt 5 16 x 2 2 17003 1011 Hex Bolt 5 16 x 2 1 2 33 17003 1611 Hex Bolt 5 16 x 4 6 17003 2211 Hex Bolt 5 16 x 5 1 2 4 17003 2411 Hex Bolt 5 16...

Page 5: ...Typical Installation Lag Screws Tap the head of the Lag Screw with a hammer to start the threads into the wood and then use a 9 16 socket to tighten DO NOT over tighten Typical Installation Wood Scre...

Page 6: ...2005 Creative Playthings Pine Skybox 19690 100 Rev J 06 16 Page 6 Play set View F H O Y X N P B S CC V U J I C R A K D Z AA BB T L M K L O P are used only on a Skybox connected to a gym with a tent r...

Page 7: ...t Long Narr 5 4 x 4 x 58 1 2 P 1 Ea 32489 102 Wall Slat Narrow 5 4 x 4 x 23 1 2 Q 1 Ea 50350 700 Hardware Bag Skybox 2005 SP CC 2 Ea 15132 400 Access Ladder Step Component Part Identification Take inv...

Page 8: ...ructure twice monthly during usage for any evidence of deterioration If upon inspection hardware has sharp edges rusted or structural pieces have signs of premature failure replace them through Creati...

Page 9: ...y be required for assembly Tent Roof Gym Wood Roof Gym Tent End Tent Support Tent Pipe Sandbox End Sandbox Seat Tent Pipe Tent Pipe End Wall Support Rear Wall Slats Sandbox End Sandbox Seat Rear Wall...

Page 10: ...and the Skybox Sandbox Side BB to the Corner Post as shown Repeat with the other Side AA BB Sandbox Side Gym A Hex Bolt Assembly consists of one Hex Bolt one Lock Washer one Flat Washer and on Weld Nu...

Page 11: ...ends of the Platform End R Locate the End Stringer E Attach each End Stringer E using two 5 16 x 5 1 2 Hex Bolt Assemblies as shown The Hex Bolt should start from the outside of the Skybox Push each b...

Page 12: ...d R using two 5 16 x 2 1 2 Hex Bolt Assemblies Do not tighten these bolts yet The Angle Braces A should be fastened so that the angled end is flat against the nearest Corner Post D A D D R STEP 8 Angl...

Page 13: ...sh to the edge of the Platform Support Attach each Platform Board X using six 8 x 2 Flat Head Wood Screws W Y Y X STEP 11 Post Extensions Place the Right Post Extension I against the right rear Gym Co...

Page 14: ...e Post Extensions STEP 13 Side Wall Supports Fasten the Right Side Wall Support J to the Right Post Extension I and adjacent Corner Post D using one 5 16 x 4 Hex Bolt Assembly in the lower hole at eac...

Page 15: ...sten the Access Ladder Bracket using a 5 16 x 3 Lag Screw and Flat Washer Repeat with the other Side Tent Support K Tent Roof Gym Only STEP 16 Tent Post Center the Tent Post L between the two rear Gym...

Page 16: ...been omitted from the illustration for clarity STEP 18 End Wall Slats Fasten the six Wall Slats removed in Step One C to the Platform End R and the Long End Wall Support U as shown Use four 8 x 1 5 8...

Page 17: ...1 1 2 from the Short Wall Slat as shown Use five 8 x 1 5 8 Wood Screws Wood Roof Gym Place one Short Wall Slat N 2 1 8 from the left Gym Corner Post and another 12 7 8 from the Gym Corner Post Center...

Page 18: ...of the Tent Pipe to the other Tent Post with the pilot drill and a Wood Screw as above Tent Roof Gym Only STEP 23 Restore Tent Drape the Tent removed in step 1 over the three middle Tent Pipes with th...

Page 19: ...he Sandbox Sides BB of the Skybox Drill a 3 16 diameter pilot hole 2 deep into the cen ter of the trimmed end of each Sandbox Side Fasten Sandbox Sides to Gym Sandbox End Drill two 1 diameter holes 1...

Page 20: ...Drill Holes The Skybox sandbox must be installed as shown on the pre vious page Fasten Cleat to Gym Sandbox End A 1 diameter counter bore 1 2 deep is required at each hole in the cleat attached to th...

Reviews: