With the main Mounting Plate studs pointing up, place the grinding
shaft in the center slots.
Then place the spring in the center hole of the grinding shaft.
Now place the first assembly on the grinding shaft making sure the
through holes are properly aligned with the main Mounting Plate.
The prongs on the grinding shaft should be aligned to the retainer
slots as well.
Place the outer Polycord holder on the Polycord.
Step 4
FLEX HEAD ASSEMBLY INSTRUCTIONS
Concrete Polishing Solutions- G-290 Operator’s Manual
24/7 Technical Support- Toll Free 1-877-472-8200
26
Step 5
Move the loosely fit assemblies to the press making sure proper
alignment stays in tact.
Start applying downward pressure with the ram of the press until
the prongs of the grinding shaft slide into the slots of the retainer.
Very slight movement of the assembly may be needed to ensure
proper alignment.
Do not force the grinding shaft prongs into the retainer with ram
pressure!
Start Polycord over the main Mounting Plate studs with
even downward hand pressure until all studs protrude the Polycord
slightly.
Note: Use of a hydraulic press could damage the assembly. A
manual press as shown is recommended.