24/7 Technical Support- Toll Free 1-877-472-8200
15
Concrete Polishing Solutions- G-290 Operator’s Manual
MAINTENANCE & REBUILDING
The G-290 has been designed to be low maintenance for the operator. As such,
there are only a few things you need to do to ensure optimum function.
Maintenance
•By following the schedule above, you can expect the G-290 to operate as designed
and perform consistently in the field.
Please follow the instructions below for rebuilding your G-290:
1. Replace lower belt on G-290:
Rebuilding
Please call our Service Department for any questions on
replacing the ring gear for your G-290