ACQUAMARINA POOL MANUAL
pag. 7 / 21
www.cpa-piscine.it
Rev.00
–
18/11/20
PHASE 1
–
Selecting a suitable site
Carefully select the site for your new pool. This is the most important decision you will have to make to ensure the safety
and success of your pool construction. An incorrect site could cause problems in the future that may cause injury, death or
financial loss.
Read carefully the check list set out below when selecting your site.
TOOLS REQUIRED
•
Phillips head screw driver
•
Small shifter
•
Clothes pegs
•
Sharp knife
•
Spirit level
•
Site excavation tools
•
Protective gloves
ACCEPTABLE
Flat, level, firm and dry ground with easy access to all sides of the pool exposed to direct sunlight, preferably in the morning.
Safe access to electricity for running the filter pump and other pool accessories. Access to main water source.
Protection from wind.
NOT ACCEPTABLE
•
sloping ground
•
concrete, asphalt, sandy gravel and swampy ground
•
close to wooden construction e.g. pergola’s and
decking
•
next to deciduous or leafy trees
•
over-head wires and clothes line
•
drains, electric wires or gas pipelines underneath
the site
•
poor or little drainage or high flood risk locations
•
high wind conditions
34
M4 x 10 - bolt
54
60
66
35
M8 x 20 - bolt
20
40
60
36
M8 - nut
20
40
60
37
ST6.3 x 19 - screw
4
8
12