COSTAN TECHNICAL DOCUMENTATION
REVISION STATUS
TRUE COPY
PAGE 20 OF 18
PRODUCT:
EPTAGLOO
ORD
DATE
CHANGE ORDER
OF THE SIGNED
DATE OF 1st ISSUE
A
18.Dec.2008
UPDATE
ORIGINAL
13/June/07
DOC. no. QSM0000406A
CHAP. No.:
040
B
28.July.2009
UPDATE
C
CHAPTER:
INSTALLATION
C
23.Feb.2010
RANGE
EXTENSION
D
11.Nov..2010
SAFETY VALVE ADDED
ISSUED BY MKT
DELAY DEVICES
DESCRIPTION I.D.
TIME
(MIN)
LIQUID LEVEL (if any)
RLL
30
ACTUATION OF EMERGENCY BACK-UP REGULATION
R0
40-50
BACK-UP CUT-IN FOR COMPRESSOR #1
R1
1
BACK-UP CUT-IN FOR COMPRESSOR #2
R2
2
BACK-UP CUT-IN FOR COMPRESSOR #3
R3
3
!
COMMISSIONING AND ON-SITE TESTING ADVICE1. All the settings in these
tables must be verified.2. All pressure switches and delay devices must be tested
and test-operated.3. Pressure switches are factory-calibrated by Quality Control
Dept. following procedure OP00144Q. They must be attached an I.D. label
including calibration values and date, as well as the ID of the person who
performed the calibration. Their lead seal must be intact. When test-run as per
operational instruction QOP019110A, correct tripping of safety pressure-switches
was simulated and verified
Summary of Contents for EPTAGLOO
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......