![background image](http://html1.mh-extra.com/html/costan/eptagloo/eptagloo_installation-user-and-maintenance-manual_2671008038.webp)
COSTAN TECHNICAL DOCUMENTATION
REVISION STATUS
TRUE COPY
PAGE 8 OF 18
PRODUCT:
EPTAGLOO
ORD
DATE
CHANGE ORDER
OF THE SIGNED
DATE OF 1st ISSUE
A
18.Dec.2008
UPDATE
ORIGINAL
13/June/07
DOC. no. QSM0000406A
CHAP. No.:
040
B
28.July.2009
UPDATE
C
CHAPTER:
INSTALLATION
C
23.Feb.2010
RANGE
EXTENSION
D
11.Nov..2010
SAFETY VALVE ADDED
ISSUED BY MKT
where:
V =
is the air flow rate in liters per second;
m =
is the mass in kilos of the refrigerant fluid with the greatest charge, having one part
whatsoever in the dedicated plant room;
14 = is the conversion factor
The ventilation system must renew the air in the room 15 times per hour.
It must be possible to operate the fans from both inside and outside the plant room, and when the
special plant room is installed in a basement, the outside plant room control switch must be on
ground floor.
Summary of Contents for EPTAGLOO
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......