
7
Load connection (M3 screw)
Motion surface
Mounting hole (M6 screw)
5. Installation and operation
Safety check should be carried out before installation, such as whether the connection wire
is damaged or broken, whether the drive power supply is grounded, etc.
5.1 Installation and Precautions
1.Ensure that the installation plane is relatively flat;
2.Mount M6 on the mounting surface directly and tighten it;
3.Mounting the load and tighten it properly to ensure the positioning accuracy.
5.2 Load
When mounting the load, ensure that the load quality is less than the maximum load
capacity of S51.ZT2S/K-C1, and try to mount the load in the center of the moving surface.
The correct position to mount the load is shown below.