11
a:
Place the bottom rail onto the tray with its end mouldings inserted into the corner post and wall channel.
b:
Centre the bottom rail between the corner post and wall channel so that there is an equal gap at each end.
a
=
=
b
Check the side panel and corner post are vertical and that the side panel is centrally positioned between the corner post and
wall channel.
From inside the enclosure, in the positions shown, drill through the corner post and wall channel into the side panel using a 3mm
drill bit,
do not drill too deep!
Fix using 6 x 10mm screws.
5
ø 3
mm
Inside
side panel
10mm
6