10
3
a:
Place the wall channels on the tray ensuring they are vertical and an equal distance back from the front of the tray.
Place masking tape against the wall before marking drill hole positions, this will help prevent the drill bit slipping. Drill 6.5mm
holes, 30mm deep and insert the wall plugs.
b:
Apply sealant to the back of the wall channels and around the fixing holes.
c:
Fix the wall channels to the walls using 8 x 32mm screws.
a
b
c
a:
Insert the side panel into the wall channel (ensuring that the H2O label is on the outside of the enclosure).
Fit the corner post
onto the side panel.
IMPORTANT:
The corner post
MUST
be fitted as shown above.
b:
Ensure that the corner post is vertical and the same distance in from the edges of the tray as the wall channels.
4
a
b
X
Y
ø 6.5
mm
Inside
32mm
Note:
Assembly
with side panel on
the left hand side
shown from now on.
H2O label
on outside
of side
panel.
Y = Side Panel widths
700 = 670 - 695mm
760 = 735 - 760mm
800 = 775 - 800mm
900 = 875 - 900mm
X = Door widths
1500 = 1450 - 1500mm
1700 = 1650 - 1700mm