2-5 Overhead Process Considerations
If your application has chilled water or process piping above the reservoir fill and vent level,
install a standpipe to a point 30 cm above the highest point in the system.
In applications where the process or its piping is 4.6 m or more above the reservoir, you
must take steps to prevent over-pressurization of the reservoir. This
condition can occur on system shutdown when the water in the system drains into the
reservoir.
To prevent this, install a check valve in the unit
TO PROCESS
line and a vacuum breaker at
the high point of the return
FROM PROCESS
line. See Figure 7 below for more information.
Note:
The reserve capacity of the reservoir can hold a volume equal to
6.1 m
of 25mm
pipe
.
The reservoir vent & fill line
to be piped 304.8mm above the highest
point of the system. The vent line
must remain open to the atmosphere.
300mm
Add check valve
if system piping
extends 4.6M
above reservoir
150mm
6.35mm
3.18mm
Hole
Summary of Contents for PCA050
Page 11: ...Page 11...
Page 12: ...Page 12...
Page 13: ...Page 13 BSP BSP BSP inches BSP inches BSP...
Page 20: ...Page 20...
Page 21: ...Page 21...
Page 22: ...Page 22...
Page 23: ...Page 23...
Page 25: ...Page 25...
Page 32: ...Page 32...
Page 34: ...Page 34...
Page 35: ...Page 35...
Page 36: ...Page 36 Notes...
Page 37: ...Page 37...
Page 38: ...Page 38...
Page 39: ...Page 39...
Page 40: ...Page 40 Notes...
Page 41: ...Page 41 Notes...
Page 42: ...Page 42 Notes...