Page | 5
4
Startup Checklists ..................................................23
4-1 Introduction
4-2 PCA Pre-Start-up Checklist
4-3 PCA Start-up Checklist
4-4 PCA Water Circuit Pressure Drop Table
5
Microprocessor Control.........................................25
5-1 Introduction
5-2 Setting the Process Water Temperature
5-3 LED Indicators
5-4 Temperature Controller Keys
5-5 Auto-Tuning PCA Series Chillers
5-6 Optional Communications
6
Optional Graphic Panel..........................................30
6-1 Indicator Lights
6-2 Switches
7
Routine Maintenance .............................................32
7-1 Lubrication
7-2 Condenser Maintenance
Summary of Contents for PCA050
Page 11: ...Page 11...
Page 12: ...Page 12...
Page 13: ...Page 13 BSP BSP BSP inches BSP inches BSP...
Page 20: ...Page 20...
Page 21: ...Page 21...
Page 22: ...Page 22...
Page 23: ...Page 23...
Page 25: ...Page 25...
Page 32: ...Page 32...
Page 34: ...Page 34...
Page 35: ...Page 35...
Page 36: ...Page 36 Notes...
Page 37: ...Page 37...
Page 38: ...Page 38...
Page 39: ...Page 39...
Page 40: ...Page 40 Notes...
Page 41: ...Page 41 Notes...
Page 42: ...Page 42 Notes...