Page | 14
2
Chiller Installation
2-1 Electrical Connections
Check serial tag voltage and amperage requirements and make sure your electrical
service conforms. See Figure 5 on page 13 for total running amps.
Bring properly sized power leads and ground from a fused disconnect (installed by your
electrician) to the main power terminal in the chiller's electrical enclosure.
Electrical connections must comply with all applicable electrical codes
The chiller must be grounded in accordance with NEC Article 250
Voltage must be within 10% of the chiller's nameplate rating.
2-2 Process Water Connections
All external chilled water connections to the process must be of adequate size.
See Figure 7 on page See 17 for sizing recommendations.
The largest possible openings and passages should be provided for the flow of chilled water
through platens, dies, moulds or other pieces of equipment.
IMPORTANT!
Keep any pressure drop in external process piping to an absolute minimum for optimum unit
operation.
To Process
Connect the
TO PROCESS
chilled water supply outlet to the process being cooled.
From Process
Connect the
FROM PROCESS
chilled water return inlet to the return from the process
back into the chiller for cooling and recirculation.
Fleming Dynamics recommends a strainer on the
FROM PROCESS
return line.
Summary of Contents for PCA050
Page 11: ...Page 11...
Page 12: ...Page 12...
Page 13: ...Page 13 BSP BSP BSP inches BSP inches BSP...
Page 20: ...Page 20...
Page 21: ...Page 21...
Page 22: ...Page 22...
Page 23: ...Page 23...
Page 25: ...Page 25...
Page 32: ...Page 32...
Page 34: ...Page 34...
Page 35: ...Page 35...
Page 36: ...Page 36 Notes...
Page 37: ...Page 37...
Page 38: ...Page 38...
Page 39: ...Page 39...
Page 40: ...Page 40 Notes...
Page 41: ...Page 41 Notes...
Page 42: ...Page 42 Notes...