15
Installation and connection instructions
for the integrated evaporator system
Attention!
According to the norm DIN EN 378, integrated evaporator systems may only be
tested or operated on spot with maximum 15 bar working pressure (otherwise
destruction of evaporator could occur).
For different connection possibilities see below:
3. OPERATION
3.1 Electronic controller
You will find the control elements behind the installation compartment door.
(See hereto picture 4, page 20).
See picture 3, page 16: electronic controller with digital display
Switch on:
Press on-/off-switch of the electronic control for approx. 2 sec.
Temperature control:
The desired temperature can be set by the electronic controller (see picture 3
electronic controller on page 16). In case none of these buttons are pressed, the
digital display shows the current value (room temperature).
1.) Cooling only connection of
evaporator as diagram I
3
rd
pipe soldered up.
Attention!
Do not bend connection
pipes.
Diagram I
liquid
suction gas
GB
Summary of Contents for AAKM Series