14
A
Initial operation / electrical connection of solid waste refrigerators
Series AKM/AAKM:
See hereto picture 1. Electrical connection has to be done over a correctly
installed sealed contact socket. We recommend a connection to a separate circuit
(fuse 10A).
Picture 1: Top view solid waste refrigerator, self-cooling, plug in
Electrical connection 230V
Cable length 2,30m
with shockproof plug
Initial operation / electrical connection of solid waste refrigerators
Series AKO/AAKO:
See hereto picture 2. Electrical connection has to be done over a correctly
installed sealed contact socket. We recommend a connection to a separate circuit
(fuse 10A).
The further connections like condensate drain, refrigeration lines and control lines
(on given solenoid valve) have to be done by local refrigeration/electrical
specialist.
Picture 2: Top view solid waste refrigerator, central cooling system
A = Electrical connection 230V
500mm FFL
B = Suction line
∅
8mm
500mm FFL
C = Fluid pipeline
∅
6mm
500mm FFL
D = Cooling system condensate
drainpipe. Connection to
funnel-shaped drain DN50,
50mm over FFL into existing
under floor siphons
160
Summary of Contents for AAKM Series
Page 42: ...42 42 ...