—
Installation
—
AI-1204Z-PE Reference Manual
—
41
—
Example 2: When controlling slave operations with
master's internal events
By outputting an internal event (interrupt) occurring on the master board, the slaves can start
operating in sync with that signal.
1
Connect the SC cable.
2
Designate master/slave with the software.
3
Assign to the connector the event signal to be output from the master.
4
Set signals from the master to the start requirements on the slave boards.
5
Start in order of slave to master boards.
2.
Connecting the Sync Connectors (CN6, CN7)
Controlling simultaneous operations between boards or controlling in sync with events is in part
depe
Connection Procedure
Connect the sync signal cable when two or more boards need to operate in sync with one another.
Connect CN6 with a smaller ID number to CN7 with a greater ID number with the cable. You should
only use the cable that came with the board.
Summary of Contents for AI-1204Z-PE
Page 4: ... 4 Table of Contents Customer Support and Inquiry 82 1 Services 83 ...
Page 19: ... 19 Setup This section explains how to set up this product ...
Page 33: ... 33 Installation This section describes how to connect to an external device with a cable ...
Page 72: ... 72 Appendix This section lists the specifications and the physical dimensions of the product ...
Page 76: ... Appendix AI 1204Z PE Reference Manual 76 2 Physical Dimensions ...
Page 77: ... Appendix AI 1204Z PE Reference Manual 77 3 Circuit Block Diagram ...