Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 33 of 44
14
Switching-off
As described earlier (see chapter 10.5 “Electrical connection”): first switch-off the Track Supply by switching
the START-input to “OFF” and after this disconnect the line voltage (i.e. by a load switch).
After disconnection of the energy supply system from the supply voltage, components or power terminals
must not be touched immediately afterwards, because capacitors might be charged. After switching off the
supply voltage wait 10 minutes (internal voltages < 60 VDC) before starting to work at the energy supply
system respectively its components.
Component lifetime may be extended by turning off the Track Supply when the IPT
®
System is not needed,
for instance during the night or on weekends.
15
Actions in case of emergency
In the case of smoke inside the cabinet, sparking or danger to personnel or equipment, immediately
disconnect the Track Supply from the main supply by first switching off the isolating switch on the door to
“OFF”. As a secondary measure disconnect the HAN-6HSB Power Plug.
Unauthorized switching on by a third person has to be prevented by removing the line fuses of the main
supply or by other adequate measures on site.
After switching off the supply voltage wait at least 10 minutes (internal voltages are then < 60 VDC) on
account of charged capacitors
before
opening the Track Supply and starting the disassembly of the energy
supply system.
The dangerous zone has to be provided with warning signs and secured with a shutoff tape against
entry by unauthorized people.