![Concoa INTELLISWITCH Installation And Operating Instructions Manual Download Page 7](http://html1.mh-extra.com/html/concoa/intelliswitch/intelliswitch_installation-and-operating-instructions-manual_2651342007.webp)
6
7
Normal operation of the IntelliSwitch can now begin. The “primary” or “active” side of the system, whether
left or right, will have the green Ready light ON and the In Use light ON. The “secondary” side or the “in-
active” side will have only the green Ready light ON.
Lighted green lights above the Source Select buttons should match the types of cylinders being used by each
side.
All switching is automatic. If the primary side drops below the set switchover point, the system will transfer
to the reserve side and the status lights will indicate the transition. The Replace status light and alarm indicate
the need to replenish a bank. In the case of high pressure cylinders, the system will reset when pressure has
been restored to the depleted bank. In the case of liquid cylinders, the system will reset when both pressure
has been restored to the depleted bank and the Reset button has been depressed.
Summary of Contents for INTELLISWITCH
Page 9: ...9 Figure 2...