background image

1-2

   I

   

Introduction

Purpose of the User Guide

This user guide describes the Conair Non-reversing Bulk Pump system and explains step-
by-step how to install, operate, maintain and repair this equipment.

Before installing this product, please take a few moments to read the user guide and re-
view the diagrams and safety information in the instruction packet. You should also review 
manuals covering associated equipment in your system. This review won’t take long, and 
it could save you valuable installation and operating time later.

How the Guide is Organized

Symbols have been used to help organize the User Guide and call your attention to impor-
tant information regarding safe installation and operation.

Symbols within triangles warn of conditions that could be hazardous to users or could 
damage equipment.  Read and take precautions before proceeding.

Numbers indicate tasks or steps to be performed by the user.

A diamond indicates the equipment’s response to an action performed by the user or a 

situation. 

An open box marks items in a checklist.  

A circle marks items in a list.

Indicates a tip.  A tip is used to provide you with a suggestion that will help you with the 
maintenance and the operation of this equipment.

Indicates a note.  A note is used to provide additional information about the steps you are 
following throughout the manual.

Your Responsibility as a User

You must be familiar with all safety procedures concerning installation, operation, and 
maintenance of this equipment.  Responsible safety procedures include:

 

Thorough view of this User Guide, paying particular attention to hazard warnings, 
appendices, and related diagrams.

 

Thorough review of the equipment itself, with careful attention to voltage sources, 
intended use, and warning labels.

 

Thorough review of instruction manuals for associated equipment.

 

Step-by-step adherence to instructions outlined in this User Guide.

   1

  u

  r

  

 

  2

 0

Summary of Contents for VRU

Page 1: ...om Corporate Office 724 584 5500 l Instant Access 24 7 Parts and Service 800 458 1960 l Parts and Service 814 437 6861 U S E R G U I D E UGC062 1016 Non Reversing Bulk Pump Assembly Model VRU Vacuum R...

Page 2: ...Manual Number UGC062 1016 Serial Number s Model Number s DISCLAIMER Conair shall not be liable for errors contained in this User Guide or for incidental consequential damages in connection with the f...

Page 3: ...Bulk Pump Assembly 2 2 How It Works 2 2 3 1 I n s t a l l a t i o n Unpacking the Boxes 3 2 Control Installation 3 3 Installing the Non Reversing Bulk Pump Assembly 3 3 4 1 O p e r a t i o n Starting...

Page 4: ...ii I Table of Contents...

Page 5: ...E C T I O N 1 I ntro ducti o n Introduction I 1 1 Introduction Purpose of the User Guide 1 2 How the Guide is Organized 1 2 Your Responsibility as a User 1 2 ATTENTION Read This So No One Gets Hurt 1...

Page 6: ...ing Numbers indicate tasks or steps to be performed by the user A diamond indicates the equipment s response to an action performed by the user or a situation An open box marks items in a checklist A...

Page 7: ...may result in equipment damage or personal in jury This equipment should be installed adjusted and serviced by qualified technical personnel who are familiar with the construction operation and potent...

Page 8: ...1 4 I Introduction...

Page 9: ...2 S E C T I O N 2 D e scri pti o n Description I 2 1 Description What is the Non Reversing Bulk Pump Assembly 2 2 How It Works 2 2...

Page 10: ...3 at 100 ft 7000 11000 16000 at 500 ft 3000 5000 8000 Throughput with PET 53lb ft3 at 100 ft 9000 14000 20000 at 500 ft 4000 6000 9500 Material air line size 2 5 in OD 3 in OD 4 in OD Model VRU 10 VRU...

Page 11: ...3 S E C T I O N 3 I ns talla t ion Installation I 3 1 Installation Unpacking the Boxes 3 2 Control Installation 3 3 Installing the Non Reversing Bulk Pump Assembly 3 3...

Page 12: ...ning it If damage is evident file a claim immediately against the carrier as it is their responsibility to pay for any damage incurred during shipping Make sure to include a detailed report of the dam...

Page 13: ...p are installed under the feet This will help the pump from moving Run power wires from the starter output on the motor using appropriate wire sizes Com pliance with NEC and or local codes is the cust...

Page 14: ...3 4 I Installation...

Page 15: ...4 S E C T I O N 4 O per a t ion Operation I 4 1 Operation Starting Operation 4 2 Stopping Operation 4 3...

Page 16: ...in etc from which material is being drawn runs empty When this happens the alarm timer lTM will time out and the alarm light comes on If the optional alarm horn has been installed it too will come on...

Page 17: ...Operation I 4 3 4 O per a t ion Stopping Operation 1 Turn power switch to OFF 2 Allow system to cool...

Page 18: ...4 4 I Operation...

Page 19: ...5 S E C T I O N 5 M aint enanc e Maintenance I 5 1 Maintenance Preventative Maintenance Schedule 5 2...

Page 20: ...gs Every 500 hours of operation U U Grease the pump Use No 2 bearing grease or the equivalent Refer to manuals from the compo nent manufacturer for additional information and instructions Every 1500 h...

Page 21: ...6 S E C T I O N 6 Tr o u b le sh oo ting Troubleshooting I 6 1 Troubleshooting Before Beginning 6 2 A Few Words of Caution 6 2...

Page 22: ...and repairing specific components are found in these materials U U Check that you have manual for other equipment connected in the system Troubleshooting may require investigating other equipment atta...

Page 23: ...ly rate with a one day minimum plus expenses Before You Call If you do have a problem please complete the following checklist before calling Conair U U Make sure you have all model control type from t...

Page 24: ...tions Inspect the equipment and perform alterations or adjustments to satisfy performance claims Charges for such inspections and corrections will be waived unless failure to meet warranty is due to m...

Reviews: