3-2
I
Installation
Unpacking the Boxes
Upon receiving the shipment, always perform a thorough inspection of the contents and
compare it the enclosed packing list. Make sure all parts listed are present and that no vis-
ible damage exists.
Inspect all of the equipment in the presence of the freight carrier’s representative for dam-
age during shipment. Note any damage on the delivery receipt before signing it. If damage
is evident, file a claim immediately against the carrier as it is their responsibility to pay for
any damage incurred during shipping. Make sure to include a detailed report of the dam-
age along with photos.
Control Installation
Mount control to a wall or other suitable structure where it will be free of vibration and
protected from weather and excessive heat. Operating temperature should not exceed
150°F {65.56°C}.
Run 3 phase electric line of appropriate voltage to disconnect, using wire sizes specified
by local electrical codes. (See wiring diagram for your model’s amperage rating.)
Summary of Contents for VRU
Page 4: ...ii I Table of Contents...
Page 8: ...1 4 I Introduction...
Page 14: ...3 4 I Installation...
Page 18: ...4 4 I Operation...