RC-1170/1270 Redundancy Switch Controllers
Revision 0
Front Panel Operation
3–1
MN-RC-1170/1270
Chapter 3. FRONT PANEL
OPERATION
Before operating the unit from the front panel, check to ensure that the installation is complete.
Check the connections from the waveguide switch indicators (shown in Chapter 1).
The unit will not be damaged if the waveguide switch indicator connections are
not made. However, the online indicators will be erroneous.
3.1
Overview
Future Product
Figure 3-1. RC-1170 Front Panel
Figure 3-2. RC-1270 Front Panel