20
Calibration Information
The Calibration Procedure should be performed annually and any time the instrument has been
repaired. The calibration procedure should be performed at an ambient temperature of 23 C
5 C (73.4 F 9 F). The procedure consists on internal components tolerance verification and
calibrating the meter reading to agree with the capacitor bank. The Calibration procedure must be
performed by qualified personnel, for more information contact Compliance West USA.
Voltage Stop Disable / Keyboard Enable by Keyboard.
If the MegaPulse 1.2x50-12.3PF-1 500ohm 0.5J tester includes TestMinder option and has the
Voltage Stop by the PC command activated, it is possible to disable it using the next keyboard
sequence:
Note: Disabling Voltage Stop enables the keyboard.
Turn OFF
the MegaPulse P tester.
Hold in the
TRIGGER
and
NOR-REV
buttons.
Turn ON
the MegaPulse P tester.
Wait until the display shows
rESE
.
Release the
TRIGGER
and
NOR-REV
buttons.
Summary of Contents for MegaPulse 1.2x50-12.3PF-1
Page 1: ...MegaPulse IMPULSE TESTER 1 2x50 12 3PF 1 500ohm 0 5J Instruction Manual...
Page 3: ......
Page 5: ...1...
Page 12: ...8 Figure 5 Test Voltages and Tolerance from IEC 60255 5...
Page 29: ...25 Figure A 5 Breakdown as the voltage is rising...
Page 30: ...26 Figure A 6 Dieletric breakdown immediately after Vpeak...
Page 31: ...27 Figure A 7 Dielectric breakdown after Vpeak delayed breakdown...