17
7.
Push the yellow
CHARGE
button. Verify the red
TRIGGER
indicator is now lit.
8. Push the red
TRIGGER
button, when the desired voltage is displayed on the front panel meter.
9.
Note that the peak amplitude of the measured output waveform is proportional to the voltage that is
read of the front panel of the MegaPulse, but it will always be somewhat lower. This is because
the meter on the MegaPulse is measuring the voltage on the main impulse storage capacitor. This
voltage will intentionally dissipate to some extent before reaching the output leads.
Summary of Contents for MegaPulse 1.2x50-12.3PF-1
Page 1: ...MegaPulse IMPULSE TESTER 1 2x50 12 3PF 1 500ohm 0 5J Instruction Manual...
Page 3: ......
Page 5: ...1...
Page 12: ...8 Figure 5 Test Voltages and Tolerance from IEC 60255 5...
Page 29: ...25 Figure A 5 Breakdown as the voltage is rising...
Page 30: ...26 Figure A 6 Dieletric breakdown immediately after Vpeak...
Page 31: ...27 Figure A 7 Dielectric breakdown after Vpeak delayed breakdown...