vi
4.4
Q-VET Installation Verification.......................................................... 4-14
4.4.1
Installing Q-VET................................................................................. 4-16
4.4.2
Running Q-VET................................................................................... 4-18
4.4.3
Reviewing Results of the Q-VET Run ................................................. 4-20
4.4.4
De-Installing Q-VET ........................................................................... 4-22
Index
Examples
4–1
Power-Up Display ................................................................................. 4-5
Figures
1–1
8-Processor AlphaServer GS160 Block Diagram .................................. 1-2
1–2
16-Processor AlphaServer GS160 Block Diagram ................................ 1-3
1–3
A Fully Configured AlphaServer GS320 System .................................. 1-4
2–1
System Cabinet 1 Assembly (H9A21-AA) ............................................. 2-2
2–2
Power Cabinet Assembly (H9A20-BA/-BB)........................................... 2-4
2–3
Expander Cabinet Assembly ................................................................. 2-5
2–4
AlphaServer GS160 System.................................................................. 2-8
2–5
Joining Power Cabinet to System Cabinet 1...................................... 2-11
2–6
Making System Cable Connections..................................................... 2-12
2–7
I/O Hose Connections.......................................................................... 2-13
2–8
OCP Cable Connections to the Power Cabinet ................................... 2-15
2–9
Making System Cable Connections..................................................... 2-19
2–10
Adding Expander Cabinets ................................................................. 2-20
2–11
Attaching a Dual-AC Switch Cabinet ................................................. 2-22
3–1
AlphaServer GS320 System.................................................................. 3-2
3–2
System Cabinet 2 Assembly (H9A21-BA) ............................................. 3-4
3–3
Preparing System Cabinet 1 for Joining............................................... 3-8
3–4
Preparing System Cabinet 2 for Joining............................................. 3-10
3–5
Joining System Cabinet 2 to System Cabinet 1.................................. 3-12
3–6
Cable Connections to the Hierarchical Switch (1) .............................. 3-14
3–7
Cable Connections to the Hierarchical Switch (2) .............................. 3-15
3–8
Joining Power Cabinet to System Cabinet 1....................................... 3-16
3–9
External Cable Connections................................................................ 3-18
3–10
CSB and Ground Connections............................................................. 3-19
3–11
I/O Hose Connections.......................................................................... 3-20
Summary of Contents for AlphaServer GS160
Page 4: ......
Page 8: ......
Page 16: ......
Page 35: ...GS160 Assembly 2 19 Figure 2 9 Making System Cable Connections PK3228 4 7 6 8 5 6 6 9 5 7...
Page 40: ......
Page 59: ...GS320 Assembly 3 19 Figure 3 10 CSB and Ground Connections 2 3 1 PK3229...
Page 92: ......