TABLE 7 Facility Requirements (continued)
Type
Requirements
Thermal
•
A minimum airflow of 39.1 cubic meters/hour (23 cubic ft/min.) available in the immediate vicinity of the switch
NOTE
Although this airflow may exceed the airflow maximum listed in the device Technical Specifications, the
additional airflow is recommended to pressurize the inlet (cool isle) side of rack installations relative to the
exhaust side to minimize recirculation of hot air back to the inlet side.
•
Ambient air temperature not exceeding 45°C (113°F) while the switch is operating
Rack (when rack-
mounted)
•
One rack unit (1U) in a 48.3 cm (19-inch) rack
•
All equipment in the rack grounded through a reliable branch circuit connection
•
Additional weight of switch not to exceed the rack’s weight limits
•
Temperature: Because the temperature within a rack assembly may be higher than the ambient room temperature, check
that the rack-environment temperature is within the specified operating temperature range.
•
Airflow: Be sure that the airflow direction for all equipment in a rack is the same or consistent.
•
Mechanical loading: Do not place any equipment on top of a rack-mounted unit.
•
Rack secured to ensure stability in case of unexpected movement
•
Circuit overloading: Be sure that the supply circuit to the rack assembly is not overloaded.
Quick Installation Checklists
The following checklists provide a high-level overview of the basic installation process from the planning stage to the point where the device comes
online and is ready to be deployed. Completing all the tasks in the suggested order ensures successful installation. It is recommended that you print
these checklists and take them to the installation site.
Pre-Installation tasks
Review all installation requirements ahead of time as part of your site preparation. Careful planning and site preparation ensures seamless
installation, especially when installing multiple devices.
TABLE 8 Installation Prerequisites
Task
Task Details or Additional Information
Completed
Unpack the device.
Take an inventory of the hardware components included in your shipment. Refer to
on page 26.
Gather necessary components and required
tools.
Review the time and items required information at the beginning of each chapter to ensure you
have gathered all necessary components required for the following installation tasks:
•
on page 27.
•
Installing Transceivers and Cables
on page 67.
Review the safety precautions.
Refer to
on page 21. For translation of these messages, refer to
on page 129.
Remove port covers
Refer to
on page 28.
Plan the installation.
Decide whether you want to install the unit on a flat surface or in a rack. For rack installation,
obtain the appropriate rack mount kit. Refer to
on page 27.
Preparing for the Installation
Quick Installation Checklists
RUCKUS ICX 7550 Switch Hardware Installation Guide
24
Part Number: 53-1005648-04
Summary of Contents for RUCKUS ICX 7550
Page 10: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 10 Part Number 53 1005648 04 ...
Page 54: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 54 Part Number 53 1005648 04 ...
Page 66: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 66 Part Number 53 1005648 04 ...
Page 76: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 76 Part Number 53 1005648 04 ...
Page 90: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 90 Part Number 53 1005648 04 ...
Page 102: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 102 Part Number 53 1005648 04 ...
Page 108: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 108 Part Number 53 1005648 04 ...
Page 114: ...RUCKUS ICX 7550 Switch Hardware Installation Guide 114 Part Number 53 1005648 04 ...