background image

ADCP-93-090 • Rev C • March 2021

Page 33

© 2021 CommScope, Inc.

Figure 33. OMX Vertical Management

Figure 34. OMX Splice Cabinet Vertical Management Channels 

ROUTE OF IFC CABLES ON

OUTSIDE OF CABLE BRACKETS

ROUTE OF OSP CABLES ON

INSIDE OF CABLE BRACKETS

CABLE

BRACKET

26091-A

OSP

CABLES

IFC

CABLE

IFC

CABLE

26092-A

Summary of Contents for OMX 600 Splice Bay

Page 1: ...www commscope com ADCP 93 090 Rev C March 2021 SPLICE BAY STANDARD RAISED FLOOR CABLE CONFIGURATION SPLICE BAY WITH LOCKABLE SPLICE TRAY DOORS RAISED FLOOR CABLE CONFIGURATION 26051 A User Manual OMX 600 Splice Bay Rev C ...

Page 2: ...ent shall CommScope be liable for any damages resulting from loss of data loss of use or loss of profits and CommScope further disclaims any and all liability for indirect incidental special consequential or other similar damages This disclaimer of liability applies to all products publications and services during and after the warranty period This publication may be verified at any time by contac...

Page 3: ... or equipment An admonishment identifies a possible hazard and then explains what may happen if the hazard is not avoided The admonishments in the form of Dangers Warnings and Cautions must be followed at all times These warnings are flagged by use of the triangular alert icon seen below and are listed in descending order of severity of injury or damage and likelihood of occurrence GENERAL SAFETY ...

Page 4: ...ion may result Do not assume the laser power is turned off or that the fiber is disconnected at the other end Danger Use adequate lifting equipment when moving or installing Fiber Distribution Hub cabinets Verify that the maximum lift weight rating of the equipment is sufficient to handle the weight of the cabinet Danger Do not stand under a Fiber Distribution Hub cabinet as it is being hoisted in...

Page 5: ... Only 4 2 1 1 Raised Floor Cable Environment 4 2 1 2 Overhead Cable Environment 5 3 CABLE ROUTING 6 3 1 OMX Splice Bay with Locking Splice Tray Doors Raised Floor Cable Environment 6 3 2 OMX Splice Bay with Locking Splice Tray Doors Overhead Cable Environment 10 3 3 OMX Splice Bay without Locking Splice Tray Doors Raised Floor Cable Environment 14 3 3 1 72 Fiber IFC Configuration 14 3 3 2 96 Fiber...

Page 6: ...ADCP 93 090 Rev C March 2021 Preface Page 2 2021 CommScope Inc TABLE OF CONTENTS Content Page ...

Page 7: ... tray doors can accommodate up to 84 round splice trays 1008 total splices Figure 1 shows the main components of the splice bay equipped with locking splice tray doors Figure 1 OMX600 Splice Bay Raised Floor Cable Environment CABLE ENTRANCE OVERHEAD CABLE ENVIRONMENT FRONT DOOR HINGED NOTE RAISED FLOOR CABLE ENVIRONMENT SHOWN SPLICE TRAYS ARE ORIENTED FOR OVERHEAD CABLE ENVIRONMENT APPLICATION 260...

Page 8: ...epending on cable origin left view for IFC counts in multiples 96 use the 96 fiber IFC configuration Figure 2 and 3 depending on cable origin right view For IFC counts in multiples of 96 reposition cable brackets as shown in Figures 2 and 3 depending on cable origin 1 2 1 72 to 96 Fiber IFC Frame Re Configuration Raised Floor Cable Environment Figure 2 72 to 96 Fiber IFC Frame Re Configuration Rai...

Page 9: ...ronment Figure 3 72 to 96 Fiber IFC Frame Re Configuration Overhead Cable Environment Shown without Front Doors Front View 26055 A 72 FIBER IFC CABLE CONFIGURATION 96 FIBER IFC CABLE CONFIGURATION REPOSITIONED CABLE TIE DOWN BRACKETS MOVE UP ONE POSITION MOVE DOWN ONE POSITION REMOVE NO CHANGE CABLE BRACKET NO NO NO LEGEND ...

Page 10: ...head cable environments respectively Figure 4 Door Lock Installation Raised Floor Cable Environment Warning Never install communication equipment in a wet location or during a lightning storm When installing or modifying communication lines disconnect lines on the network side before working with uninsulated wires or terminals 26057 A STOP CAM KEY SET NOTE MAKE SURE STRAIGHT CAM IS ORIENTED UP AS ...

Page 11: ...Cable Environment Figure 5 Door Lock Assembly Overhead Cable Environment 26058 A STOP CAM KEY SET NOTE MAKE SURE STRAIGHT CAM IS ORIENTED UP AS SHOWN FOR RAISED FLOOR CONFIGURATIONS THREADED CYLINDER LOCK LOCK WASHER STRAIGHT CAM SEE NOTE DOOR LOCK NUT BEZEL CYLINDER NUT ...

Page 12: ...front view Figure 6 Fully Cabled Splice Bay Front View 26059 A ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES IFC CABLES 1 2 3 7 6...

Page 13: ...rocedure 1 Route and secure OSP cable to the bay as shown in Figure 7 Figure 7 OSP Cable Routing Raised Floor Cable Environment 26060 A 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY FRONT VIEW TOKE 2 GROMMET NOTE FOR OSP CABLE WITH METALLIC SHEATH MEMBERS SEE SECTION 4 3 ON PAGE 39 ...

Page 14: ...secure IFC cable to the bay as shown in Figure 8 Figure 8 IFC Cable Routing Raised Floor Cable Environment 26061 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 FRONT VIEW ...

Page 15: ...ADCP 93 090 Rev C March 2021 Page 9 2021 CommScope Inc 3 Route second OSP and IFC cable respectively as shown in Figure 9 Figure 9 Second OSP and IFC Cable Routing Procedure ...

Page 16: ...lly Cabled Splice Bay Front View 26053 A ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES IFC CABLES 1 2 3 7 62 CM 3 IN WIRE TIE COR...

Page 17: ... and secure OSP cable to the bay as shown in Figure 11 Figure 11 OSP Cable Routing Overhead Cable Environment Note For OSP cable with metallic sheath members see Section 4 3 Ground OSP Cable with Metallic Sheath Members on page 34 26064 A 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY TOKE 2 GROMMET ...

Page 18: ... secure IFC cable to the bay as shown in Figure 12 Figure 12 IFC Cable Routing Overhead Cable Environment 26065 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 FRONT VIEW ...

Page 19: ... 090 Rev C March 2021 Page 13 2021 CommScope Inc 3 Route second OSP and IFC cable respectively as shown in Figure 13 Figure 13 Second OSP and IFC Cable Routing Procedure 26065 A OSP CABLE IFC CABLE FRONT VIEW ...

Page 20: ...bay front view Figure 14 Fully Cabled Bay Front View 72 Fiber IFC Configuration ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES IFC...

Page 21: ...and secure first OSP cable to the bay as shown in Figure 15 Figure 15 OSP Cable Routing Raised Floor Cable Environment 72 Fiber IFC Configuration 26068 A 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY FRONT VIEW TOKE 2 GROMMET NOTE FOR OSP CABLE WITH METALLIC SHEATH MEMBERS SEE SECTION 4 3 ON PAGE 39 ...

Page 22: ...ble to the bay as shown in Figure 16 Use corrugated tubing to secure IFC and OSP cables to the frame as shown Figure 16 IFC Cable Routing Raised Floor Cable Environment 72 Fiber IFC Configuration 26069 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 ...

Page 23: ...90 Rev C March 2021 Page 17 2021 CommScope Inc Figure 17 shows a front view of the OSP and IFC cable routing Figure 17 OSP and IFC Cable Routing Front View 72 Fiber IFC Configuration 26070 A OSP CABLE IFC CABLE ...

Page 24: ...inue routing OSP and IFC cables as shown in Figure 18 Figure 18 OSP and IFC Cable Routing Method 72 Fiber IFC Configuration 26071 A SECURE IFC CABLES TO OUTSIDE OF CABLE TIE DOWN BRACKETS OSP CABLES IFC CABLES SECUREOSP CABLES TO INSIDE OF CABLE TIE DOWN BRACKETS ...

Page 25: ...nfiguration Figure 19 Fully Cabled Splice Bay Front View 96 Fiber IFC Configuration ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES...

Page 26: ...the bay as shown in Figure 20 Figure 20 OSP Cable Routing Raised Floor Cable Environment 96 Fiber IFC Configuration 26073 A 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY TOKE 2 GROMMET SKIP BOTTOM FOUR SPLCE TRAYS BOTH SIDES OSP CABLE OSP CABLE FRONT VIEW NOTE FOR OSP CABLE WITH METALLIC SHEATH MEMBERS SEE SECTION 4 3 ON PAGE 39 ...

Page 27: ...ble and OSP cable to the bay as shown in Figure 21 Figure 21 IFC Cable Routing Raised Floor Cable Environment 96 Fiber IFC Configuration 26074 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 ...

Page 28: ...ice bay front view Figure 22 Fully Cabled Splice Bay Front View ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES IFC CABLES 26075 A ...

Page 29: ...rst OSP cable to the bay as shown in Figure 23 Figure 23 OSP Cable Routing Overhead Cable Environment 72 Fiber IFC Configuration Note For OSP cable with metallic sheath members see Section 4 3 Ground OSP Cable with Metallic Sheath Members on page 34 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY TOKE 2 GROMMET 26076 A ...

Page 30: ...and OSP cable to the bay as shown in Figure 24 Figure 24 IFC Cable Routing Overhead Cable Environment 72 Fiber IFC Configuration 26077 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 FRONT VIEW ...

Page 31: ...front view of the cable routing procedure for the first and second OSP and IFC cables Continue routing cables in the same manner Figure 25 OSP and IFC Cable Routing Procedure Overhead Cable Environment 26078 A FIRST OSP CABLE FIRST IFC CABLE SECOND OSP CABLE SECOND IFC CABLE ...

Page 32: ...r IFC Configuration Use the following procedure ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS STARTING AT LOWEST CABLE BRACKET ROUTE CABLES CLOSEST TO FRAME AND WORK UP AND OUT ROUTE OSP AND IFC CABLES TO THEIR RESPECTIVE SPLICE TRAYS USING TUBING SECURE CABLES TO TIE DOWN LANCE ON FRAME CABLE BRACKET OSP CABLES IFC CABLES 26079 A 1 2 3 7 62 CM 3 ...

Page 33: ...96 fiber configuration 2 Route OSP cable as shown in Figure 27 Figure 27 OSP Cable Routing Overhead Cable Environment 96 Fiber IFC Configuration 26080 A 10 32 SCREW 2 OSP CABLE CLAMP ASSEMBLY FRONT VIEW TOKE 2 GROMMET NOTE FOR OSP CABLE WITH METALLIC SHEATH MEMBERS SEE SECTION 4 3 ON PAGE 39 SKIP TOP FOUR SPLCE TRAYS BOTH SIDES ...

Page 34: ...h OSP cable to the bay as shown in Figure 28 Figure 28 IFC Cable Routing Overhead Cable Environment 96 Fiber IFC Configuration 26081 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE OSP CABLE IFC CABLE OSP CABLE IFC CABLE SECURE COVER 2 YOKE 2 GROMMET IFC CABLE CLAMP ASSEMBLY 1 2 3 4 FRONT VIEW ...

Page 35: ...gure 29 Figure 29 OSP and IFC Cable Routing Method 96 Fiber IFC Overhead Cable Environment ROUTE IFC CABLES TO THE OUTSIDE OF THE CABLE BRACKETS ROUTE OSP CABLES TO THE INSIDE OF THE OF CABLE BRACKETS ROUTE CABLE STARTING AT THE TOP AND CLOSEST TO THE FRAME AND WORK DOWN AND OUT OSP CABLES IFC CABLES 26082 A ...

Page 36: ... for the 5 184 fiber application 54 right verticals and 54 left verticals With six splice trays not being used in each vertical six on each side room is available to secure the large fiber count blocking kits within the OMX Splice Cabinet By using splice tray position 13 as the starting point for the splice wheels ample room is available for two 864 Ribbon Fiber Central Tube Blocking Kits to be mo...

Page 37: ... the locking end engaging the tie one or two clicks Do this for all tray locations except the top four on each side 3 Cut corrugated tubing to 2 5 lengths and add to every position on the back wall of the OMX cabinet see Figure 31 Snug down the cable ties making sure not to crush the corrugated tubing Figure 31 Cutting Corrugated Tubing 26090 A TIE DOWN LACE CORRUGATED TUBING WIRE TIE IFC CABLE OS...

Page 38: ...nd Blocking Kit within OMX Cabinet as follows a Route the 864 Fiber Cable across the horizontal pathway to OMX splice cabinet Secure cable to ladder racking above OMX splice cabinet see Figure 32 making sure cable is routed over the outer edge of the cable rack and not through the center of the cable rack Figure 32 Ladder Racking Above OMX Splice Cabinet b Place 864 fiber cable inside OMX Splice C...

Page 39: ...Inc Figure 33 OMX Vertical Management Figure 34 OMX Splice Cabinet Vertical Management Channels ROUTE OF IFC CABLES ON OUTSIDE OF CABLE BRACKETS ROUTE OF OSP CABLES ON INSIDE OF CABLE BRACKETS CABLE BRACKET 26091 A OSP CABLES IFC CABLE IFC CABLE 26092 A ...

Page 40: ...ote The final positioning of the 864 fiber Blocking Kit within the center portion of the cable management channel of the OMX Splice Cabinet is critical The Blocking Kit will be positioned to allow room for additional cables and blocking kits within the central channel of the OMX Splice Cabinet Make sure that the bottom of the OSP blocking kit is 7 inches above the first splice tray location If thi...

Page 41: ...ADCP 93 090 Rev C March 2021 Page 35 2021 CommScope Inc Figure 36 OSP Breakout Assembles ...

Page 42: ...ing of the Blocking Kit as shown in Figure 37 8 Complete the IFC routing per Figure 38 Figure 37 192 Fiber IFC Blocking Kit Position Note The final positioning of the IFC fiber Blocking Kit within the outer portions of the cable management channel of the OMX Splice Cabinet is important The Blocking Kit will be positioned to allow room for additional cables and blocking kits in the two outer cable ...

Page 43: ...ADCP 93 090 Rev C March 2021 Page 37 2021 CommScope Inc Figure 38 IFC Breakout Assemblies ...

Page 44: ...Grounding Procedure INSERT SCREW THROUGH GROUND HOLE FROM OUTSIDE OF DOOR DOOR FRAME TO FRAME INSIDE SURFACE OF DOOR NUT GROUND HOLE DOOR SIDE GROUND KIT ASSEMBLY NOTE RAISED FLOOR CONFIGURATION SHOWN FOR OVERHEAD CONFIGURATION GROUNDING LOCATIONS ARE AT UPPER FRONT OF BAY DOOR GROUNDLING LOCATIONS BOTH SIDES GROUND KIT ASSEMBLED FRAME SIDE GROUND KIT ASSEMBLY LOCK WASHER GROUND LUG BOTH SIDES STA...

Page 45: ...t ordered separately ground the frame as shown in Figure 40 Figure 40 Frame Grounding Method M6 SCREW 2 TO BUILDING GROUND GROUND LUG FOR RAISED FLOOR CABLE ENVIRONMENTS FOR OVERHEAD CABLE ENVIRONMENTS ADDITIONAL GROUND LOCATION 26084 A M6 SCREW 2 GROUND LUG ADDITIONAL GROUND LOCATION TO BUILDING GROUND ...

Page 46: ...own in Figure 41 Figure 41 Ground Lug and Ground Wire Procedure Raised Floor Cable Environment ROUTE GROUND WIRE AS SHOWN SECURE TO FRAME USING WIRE CLIP AND M4 SCREW MX6 ACC016 KIT MUST BE SEPARATELY ORDERED NOTE ONE GROUNDING KIT WILL CREATE A GROUND BUS ON ONE SIDE OF THE CABINET IF A GROUNDING BUS IS REQUIRED ON BOTH SIDES OF THE CABINET AS ILLUSTRATED TWO GROUNDING KITS MUST BE ORDERED WIRE C...

Page 47: ...e 41 2021 CommScope Inc Figure 42 shows an overview of an OSP cable with metallic sheath members routed and terminated Figure 42 OSP Cable Metallic Sheath Members Routing Overview OSP CABLE GROUND LUG EITHER SIDE 26086 A SEE DETAIL A ...

Page 48: ... Page 42 2021 CommScope Inc Figure 34 shows Detail A refer to Figure 43 For OSP cable preparation follow the steps shown in Figures 35 and 36 Figure 43 Detail A OSP SHIELD CONNECTOR CLAMP KIT 26087 A WIRE CLIP SPLIT BOLT CONNECTOR ...

Page 49: ...LD METALLIC SHEATH MEMBERS FLUSH WITH CABLE SHEATH EXPOSING 0 75 INCHES OF CORE WRAP 1 MAKE A 1 0 INCH CUT IN CABLE SHEATH OPPOSITE POINT AT WHICH BASE CLIP WILL BE INSERTED 2 CABLE SHEATH RUBBER OUTER JACKET SHIELD METALLIC SHEATH MEMBERS CORE WRAP 0 75 IN 1 9 CM 1 0 IN 2 54 CM CABLE SHEATH RUBBER CABLE SHEATH TAP HERE CABLE SHEATH RUBBER INSERT BASE BETWEEN SHIELD AND CORE WRAP SLIDE BASE CLIP I...

Page 50: ...mmScope Support Center using the following website address http www commscope com SupportCenter 26089 A TOP CLIP CONNECTOR GROUND CONNECTOR BASE CLIP CONNECTOR SECURING NUT 2 36 WIRE SPLIT BOLT CONNECTOR ROUTE 36 WIRE AS SHOWN 6 ASSEMBLE COMPONENTS ON STUD AS SHOWN 5 STUD WIRE CLIP SECURE TO FRAME STRIP JACKET BACK 1 0 INCH TO EXPOSE BARE WIRE TIGHTEN NUT TO GROUND LUG ...