14
Install Branch cable
14.1
Prepare the branch cable as explained in section 9. Insert the branch cable in the middle position on the rear. Verify
in section 10.1 if the port reducers should be removed or be partially be removed.
14.2
Route the subunits to the splice tray. The subunits can be routed left or right. It is advised to route the drop fibers
to the opposite side that the feeder fibers enters the tray. Note that this is depended on how the feeder fiber is routed to the
splice tray (via the uncut fiber storage or directly to the splice tray).
15
Splice application
15.1
Route drop fibers to splice tray
15.1.1
Drops can be routed to either left or right. It is advised to route the drop fibers to the opposite side that the feeder
fibers enters the tray. Note that this is depended on how the feeder fiber is routed to the splice tray (via the uncut fiber
storage or directly to the splice tray).
Note
: Make sure the sub units are routed between the rib and the organizer edge as indicated in the figure above.
1
2
stripping
point
stripping
point
Feeder fiber routed directed to splice tray
Feeder fiber routed via uncut fiber storage
1
2
3
4
5
6
stripping
point
stripping
point
1
2
3
4
5
6
1a
1b
+/-1cm
+/-1cm