![CommScope FOSC-400A4 Installation Instruction Download Page 6](http://html1.mh-extra.com/html/commscope/fosc-400a4/fosc-400a4_installation-instruction_2643747006.webp)
6
4.3
Remove any dirt, mud or other
contaminants from the cable sheath for
approximately 2 meters with a clean cloth.
Take the oval cable seal and slide it over the
cables. The non-coated edge of the sleeve
and the arrows should be pointed to the base
of the closure.
4.2
Install the FOSC in the FOSC-STAND
and open the oval port for cable entry by
cutting the port at the ridge with a hacksaw.
Deburr the inner edge of the port opening
with abrasive strip.
4.1
Loose the clamp.
Push the lever down to release the locking tab.
Open the clamp lever and release the clamp
using the lever legs.
Remove the clamp, dome and sealing ring
and store carefully for later use.
3
General precautions
3.1
Do not use damaged sleeve nor trim
heat-shrinkable sleeve before installation.
3.2
The FOSC-400A4 closures can be
installed at temperatures between -1°C and
+45°C.
3.3
Generators used should have enough
capacity for the hot air gun utilisation.
Optical fiber infrastructure network
elements may contain end of optical fiber
attached to the optical output when the
device is operational. Laser radiation can
seriously damage your eyesight. Please
follow your local safety guidelines.
4
Cable installation in oval
outlet