![CommScope FOSC-400A4 Installation Instruction Download Page 16](http://html1.mh-extra.com/html/commscope/fosc-400a4/fosc-400a4_installation-instruction_2643747016.webp)
16
11.10
Slide the cable seal over the port.
Shrink the cable sleeve on the base side with
the recommended hot air gun device. Use the
reflector to ensure heat distribution around the
outlet. Shrink sleeve until the green thermo-
indicating paint is converted to black.
Note: setting thermogun:
FACC-HEAT-GUN-220V in position 10.
Minimum hot air temperature should be
350°C.
11.11
Shrink down the end of the sleeve
on the cable side. Heat till the sleeve shrinks
down onto the cable and the green
thermo-indicating paint is converted to black.
A ring of red adhesive should be visible at the
cable on the end of the sleeve.
11.7
Abrade port and cable sheath
circumferentially on the cleaned area with the
abrasive strip. Remove any abraded material
with a clean cloth.
11.8
Place cable seal over the drop outlet of
FOSC base. When cable seal butts against
the base, mark the sleeve length on cable
sheath.
11.9
Match the blue line of the aluminium
cable protection foil with the marks on the
cables. Wrap the aluminium cable protection
foil around cable.