9
FIST-GR-CTB100CC (central core)
1 Breakout device
2 Breakout device cover + screws
3 Cable b screws
4 Mounting b w screws
5 2 cable clamps
6 Unraveling tool
7 2 strength member stops + screws
1
2
3
4
6
5
7
b) Central core (single fiber or ribbon) and loose tube ribbon
FIST-GR-CTB100 (loose tube ribbon)
1 Breakout device
2 Breakout device cover + screws
3 Cable b screws
4 Mounting b w screws
5 2 cable clamps
6 Unraveling tool
7 2 strength member termin screws
1
2
3
4
5
6
7
4.1.19 Place the breakout device on the cable bracket.
4.1.20 Prepare the cable. Make sure you have 3,5 m fiber inside the
shelf. Respect dimensions shown on the drawings. Clean the fibers very
well to make easy feeding possible.
4.1.21 Loose tube ribbon cable.
4.1.18 Choose a position in the side duct or on the cable termination
plate as close as possible to the GSS. Mount the mounting bracket on
that position with the two screws. Mount the cable bracket with two
screws on the mounting bracket.