13
4.2.2 Right side mounting cable coming from the top.
4.2.3 Strip the cable over 3,5 m. Cut the strength member at
35 mm from the outer jacket. Apply foam tape at the tie wrap positions.
Install the prepared cable on the side termination plate.
4.2.4 Install the plastic stand-off as shown. Mount the fixed tie wrap
at the position as shown.
4.2.6 Mark the transportation tubes 10 mm from the plastic stand-off.
Mark the loose tubes 30 mm from the plastic stand-off.
4.2.7 After stripping the loose tubes and cutting of the overlength of
the transportation tubes, slide the FOPT-CT over the transportation tubes.
Clean the fibers very well to make feeding easier.
4.2.5 In case of front mounting, mount the fixed tie wrap as shown.
70 mm
85 mm