Appendix 

Parameters for Circuit Breakers 

To be able to reach requested timing as per VDE-AR-N-4105, CB has to be able to open contacts within 
80ms from deactivation. Our concept supposed to use 100ms reaction time for control equipment reaction 
and 80ms is time dedicated for CB reaction. 
 
You have to use a reliable Circuit Breaker with known reliability and this Circuit breaker has to have contacts 
constructed in the way which avoid false feedback indication in case of any failure. Circuit breaker has to be 
design for compliance with VDE-AR-N 4105. 
Example could be e.g. Schneider Electric NSX, NS and NW family or ABB Tmax or Emax family, plus many 
others. 
 

Commissioning 

The safety functions, created by: 

·

  Combination of controller and MainsPro relay 

 
has to wired per instructions above and shall be tested prior connection of the plant to the network. 
 
Test of MainsPro relay: 

·

  Activate BI: 1 Ext Trip on the MainsPro. MainsPro terminal number 24 shall change its state. 

·

  Deactivate BI:1 Ext Trip on the MainsPro. MainsPro terminal number 24 shall change its state to 

original value. 

 
Test of MainsPro relay is done by every closing and opening of the CB2. In case MainsPro relay fails, 
controller issue alarm: GCB fdb S fail and trips the plant from network, type of protection Shutdown. 

 
Safety functions has to be checked during commissioning and record has to be made about this test. 

Then, customer has to establish period for periodic testing. 

Summary of Contents for IG-NT-BB

Page 1: ...ied to input terminal In case the logic on particular installation site is opposite e g binary outputs are high side switch type the corresponding change has to be taken into account in the scheme as...

Page 2: ...undant GCBs and 1 MCB The breaker redundancy requirement of the VDE AR N 4105 is created with the GCB breakers to ensure the gen set is disconnected from network and any remaining customer system as 4...

Page 3: ...gnal to controller to trip the primary circuit breaker This interconnection ensures that both breakers are tripped in every case the network parameters are out of limits and also both the controller a...

Page 4: ...blic ISO 9001 Certified C omAp s r o Q u ality Managem e n t Tel 420 246012111 Fax 420 2 66316647 E mail info comap cz Internet http www comap cz Pict 4 Block scheme how to connect the Controller and...

Page 5: ...6647 E mail info comap cz Internet http www comap cz Pict 5 Block scheme how to connect the Controller and MainsPro unit in case circuit breaker is used for GCB control in SPI or SPtM application For...

Page 6: ...ation in case of any failure Circuit breaker has to be design for compliance with VDE AR N 4105 Example could be e g Schneider Electric NSX NS and NW family or ABB Tmax or Emax family plus many others...

Page 7: ...MainsPro Controller Groupe Name of setpoint Value Mains protect Mains V MP 80 Mains V MP 115 Mains f 51 5Hz Mains f 47 5Hz Mains Avg V MP 110 MainsProtDel 0s Protect type LOW VOLT Sync Load ctrl Main...

Reviews: