If possible, use rigid tubing. Some flex hose will tend to sag and generate static that could
cause de-mixing between the blender and the extruder.
Make sure that adequate space is around the blender (36” recommended) to allow proper
cleaning, servicing, etc.
Floor Mount (Central Blender)
In a floor mounting application, ensure adequate clearance for all blender operations and
maintenance. The operator and maintenance personnel must have access to parts of the
blender. If necessary, it is the customer’s responsibility to provide adequate, safe work
platforms around the blender to meet state and local safety codes. Using proper lifting
equipment, lift the Slide Gate blender in place.
Note:
The blender must be securely fastened to the floor before operating.
Note:
Manufacturer assumes no responsibility for any damages resulting from
improper installation or improper handling during installation.
Make sure that the blender is
securely mounted to the floor
before installing loading
equipment, loading with material and starting.
Make sure that the blender location is adequately away from high traffic aisles, and that fork
trucks, etc. cannot damage the blender. Ensure that normal day-to-day operations will not
place the blending system at risk of damage.
Figure 22: Typical Floor Mount (Central) Blender Layout
BF1-615.3
Chapter 3: 2BInstallation
33 of 101
Summary of Contents for 882.00273.00
Page 22: ...Figure 11 Typical Operator Screens BF1 615 3 Chapter 2 1BFunctional Description 22 of 101...
Page 23: ...Figure 12 Typical Setup Screens BF1 615 3 Chapter 2 1BFunctional Description 23 of 101...
Page 24: ...BF1 615 3 Chapter 2 1BFunctional Description 24 of 101...
Page 75: ...Mixer Sub Assembly BF1 615 3 Chapter 7 6BAppendix 75 of 101...