![COBHAM Sea Tel 4010W-91 Installation Manual Download Page 44](http://html1.mh-extra.com/html/cobham/sea-tel-4010w-91/sea-tel-4010w-91_installation-manual_2630064044.webp)
4010W-91 Installation Manual
Setup – Tracking Receiver - VSAT
6-2
6.5.
Volt
6.5.1.
Above Decks Powered - The LNB’s installed onto all Series 09 VSAT antenna systems are powered by the
antenna itself (above decks), and thus there is no applicable use for VOLT control. For antenna systems that
have voltage and tone controlled multiband LNB’s installed, you will use the tracking band selection to
control/toggle the voltage output of the ADE 400MHz FSK modem. For detailed information, refer to the
“SETUP-Band Select” section of this document.
VSAT Application
6.6.
SAT SKEW
SKEW is used to optimize the polarization of the feed to the desired satellite signal. In VSAT systems this is normally
adjusted during the cross-pol isolation testing with the Network or Satellite Provider (refer to (Optimizing Cross-Pol
Isolation).
6.7.
NID
In VSAT systems the Network Identification parameter should always be set to 0000 to allow external network lock to
be supplied into the ACU from the satellite modem.
Summary of Contents for Sea Tel 4010W-91
Page 3: ......
Page 4: ......
Page 10: ......
Page 38: ...4010W 91 Installation Manual Installation 3 18 This Page Intentionally Left Blank...
Page 42: ...4010W 91 Installation Manual Setup Ships Gyro Compass 5 2 This Page Intentionally Left Blank...
Page 48: ...4010W 91 Installation Manual Setup Band Selection 7 4 This Page Intentionally Left Blank...
Page 60: ...4010W 91 Installation Manual Setup Searching 10 6 This Page Intentionally Left Blank...
Page 104: ...4010W 91 Installation Manual DRAWINGS 20 2 This Page Intentionally Left Blank...
Page 109: ......
Page 110: ......
Page 111: ......
Page 118: ......
Page 125: ......
Page 133: ......
Page 135: ......
Page 138: ......
Page 139: ......
Page 141: ......