Microprocessed Voltage Regulator
Three-Phase Perfection Premium Series
User´s Manual
CM COMANDOS LINEARES
- 2/38 -
Table of Contents
Security Regulations ________________________________________________________ 3
Receipt __________________________________________________________________ 4
Receipt Inspection by the Client _______________________________________________ 4
Refusal of the Material _______________________________________________________ 5
Receipt with Reservations ____________________________________________________ 5
Handling _________________________________________________________________ 6
Storage __________________________________________________________________ 7
Installation ________________________________________________________________ 8
– Choice of local and environment setting ______________________________ 8
Positioning ________________________________________________________________ 9
Composition ______________________________________________________________ 10
– typical installation sketches ______________________________ 10
* For other voltages, please, consult
Department. Placement of Internal Components __________________________________ 11
Cable Terminal Block _______________________________________________________ 13
IT Model Connection Label __________________________________________________ 14
Terminal Label ____________________________________________________________ 14
OUTPUT NEUTRAL _______________________________________________________ 14
GROUND ________________________________________________________________ 14
Cable Connections ________________________________________________________ 15
Initial activation ___________________________________________________________ 16
Functional Check __________________________________________________________ 18
Failure Reset or Alarm, with Connected Load. ___________________________________ 18
Voltage regulator Operation Recommendation ___________________________________ 18
Functioning Theory ________________________________________________________ 19
System Description ________________________________________________________ 19
Purpose: ________________________________________________________________ 19
Applications ______________________________________________________________ 19
Performance _____________________________________________________________ 19
Stabilization Principle _______________________________________________________ 20
Panel Messages and Measurements ___________________________________________ 21
Normal Operation _________________________________________________________ 21
Baud Rate Serial __________________________________________________________ 21
Serial Number ____________________________________________________________ 22
Sound Alarm _____________________________________________________________ 22
Date & Time ______________________________________________________________ 22
Output Power KVA _________________________________________________________ 22
Output Power KW _________________________________________________________ 22
Network Frequency ________________________________________________________ 22
RST Output Voltage ________________________________________________________ 22
RST Input Voltage _________________________________________________________ 22
Alarm Description _________________________________________________________ 23
Under and Over Voltage Protection ____________________________________________ 25
System with Automatic Reset ________________________________________________ 26
Main Characteristics _______________________________________________________ 26
Technical Specifications ____________________________________________________ 27
Physical Dimension Table ___________________________________________________ 29
– Isolated Three-Phase _____________________________________________ 29
– Three-phase with input auto transformer _____________________________ 29
– Three-phase without input transformer ________________________________ 30
Internal Circuit Breaker Table ________________________________________________ 30
Preventive Maintenance ____________________________________________________ 31
First Aid _________________________________________________________________ 32
Corrective Maintenance _____________________________________________________ 34
Procedures to open a technical call ____________________________________________ 34
Accredited Network ________________________________________________________ 34