![CLIVET WSAT-YSC4 Manual Download Page 28](http://html1.mh-extra.com/html/clivet/wsat-ysc4/wsat-ysc4_manual_2625561028.webp)
General
The indicated operations should be done by qualified
technician with specific training on the product.
The electrical, water connections and the other system works are
by the installer.
Agree upon in advance the start-up data with the service centre.
Agree upon in advance the star-up data with the service centre.
For details, refer to the various chapters in the manual.
Before checking, please verify the following:
the unit should be installed properly and in conformity with
this manual
the electrical power supply line should be sectioned at the
beginning.
The line sectionalizing device is open, locked and equipped
with the suitable warning
make sure no tension is present
WARNING
After turning off the power, wait at least 10 minutes before
accessing to the electrical panel or any other electrical
component.
Before accessing check with a multimeter that there are no
residual stresses
Do not power the unit with empty water side exchangers.
Possible damage to anti-freeze electric heaters.
6 - START-UP
Summary of Contents for WSAT-YSC4
Page 1: ...R32 M0T400002 01 09 21 MANUAL FOR INSTALLATION USE AND MAINTENANCE...
Page 2: ......
Page 3: ......
Page 19: ...Connections performed by costumer 5 ELECTRICAL CONNECTIONS...
Page 37: ...7 CONTROL...
Page 39: ...7 CONTROL...
Page 40: ...7 CONTROL...
Page 55: ...10 ANTIVIBRATION MOUNTS 1 2 3 4 5 7 6 8...