23
6 START-UP
Preliminary checks
Unit OFF power supply
Yes / No
1 safe access
2
suitable
frame
to
withstand
unit
weight
+
people
weight
3 functional clearances
4 air flow: correct return and supply (no bypass, no stratification)
5
considered
level
to
be
reachable
by
snow
6
considered
main
winds
7
lack
of
chimneys/corrosive
atmospheres/pollutants
8 structure integrity
9 fans run freely
10 unit on vibration isolators
11 unit input water shut-off valves for cleaning
12 vibration dampeners on hydraulic connections
13 expansion tank (recommended volume = 10% system content)
14 minimum system water content
15 clean system
16 loaded possible glycol so corrosion inhibitor
17 system under pr vented
18 refrigerant circuit visual check
19 earthing connection
20 power supply features
21 remote On-Off
Summary of Contents for WDAT-iZ4
Page 1: ...R1234ze MANUAL FOR INSTALLATION USE AND MAINTENANCE WDAT iZ4 120 1 580 2 ...
Page 18: ...18 5 ELECTRICAL CONNECTIONS ...
Page 32: ...32 7 CONTROL ...
Page 33: ...33 7 CONTROL ...
Page 34: ...34 7 CONTROL ...
Page 35: ...35 7 CONTROL ...
Page 36: ...36 7 CONTROL ...
Page 37: ...37 7 CONTROL ...
Page 38: ...38 7 CONTROL ...
Page 39: ...39 7 CONTROL ...
Page 51: ...51 Compressor replacement 8 MAINTENANCE ...
Page 53: ...53 9 ANTIVIBRATION MOUNTS ...
Page 54: ...54 9 ANTIVIBRATION MOUNTS ...
Page 71: ......