24
6 START-UP
General
The indicated operations should be done by qualified
technician with specific training on the product.
The electrical, water connections and the other system works are
by the installer.
Agree upon in advance the start-up data with the service centre.
Agree upon in advance the star-up data with the service centre.
For details, refer to the various chapters in the manual.
Before checking, please verify the following:
the unit should be installed properly and in conformity with
this manual
the electrical power supply line should be sectioned at the
beginning.
The line sectionalizing device is open, locked and equipped
with the suitable warning
make sure no tension is present
WARNING
After turning off the power, wait at least 10 minutes before
accessing to the electrical panel or any other electrical
component.
Before accessing check with a multimeter that there are no
residual stresses
Do not power the unit with empty water side exchangers.
Possible damage to anti-freeze electric heaters.
Summary of Contents for R513A
Page 1: ...R513A MANUAL FOR INSTALLATION USE AND MAINTENANCE WDAT ik4 120 1 580 2 MF500002 00 11 20...
Page 20: ...20 5 ELECTRICAL CONNECTIONS...
Page 34: ...34 7 CONTROL...
Page 35: ...35 7 CONTROL...
Page 36: ...36 7 CONTROL...
Page 37: ...37 7 CONTROL...
Page 52: ...52 9 ANTIVIBRATION MOUNTS...
Page 53: ...53 9 ANTIVIBRATION MOUNTS...
Page 73: ......