4. Installation Instructions
4.1 Ground screw Installation
4.1.1
Before the installation, please
prepare necessary installation
tools & products, and ensure
that hydraulic pile driver can
work normally in installation
site. Read the relevant
engineering materials; get the
project layout information such
as piling depth, column span,
etc. If you have any questions,
please contact and consult the
customer service.
4.1.2 According to the
installation planning, use Total
station (or any instrument of
similar functions) to carry out
positioning mark and mark out
the piling position of each
ground screw. Check the mark
position before piling, to
ensure accuracy.
4.1.3 Make necessary
adjustment to make sure that
all ground screw are on the
same level and are all aligned.
Figure1
Piling depth, horizontal and vertical position of Ground screws are
determined by the engineering drawings of specific programs
If cannot eliminate the deviation of
Ground Screw, its maximum allowable
deviation should in the range of
adjustment shown in below Figure15.
Figure2