17
/
18
No. 999-1009, Min’an Avenue, Xiang’an 1/10 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: ww2w.clenergy.com.au
4.6 PV Modules Installation
4.6.1 Tilt the Clamps with M-
module and click the lower
side of M-module into the
channel of the Rail first, then
press the other side of M-
module into the channel as
shown in Figure25.
4.6.2 It is suggested to install
PV-Module from the left side,
and use the End Clamp and
Inter Clamp II to fix it.
Stretch a
String as a reference to align
PV-Module. Adjust the PV-
Modules to make their outside
faces are in a line in both
portrait
and
landscape
orientation.
Recommended Torque:
M8:
18~20 N•m
Figure25