14
/
18
No. 999-1009, Min’an Avenue, Xiang’an 1/10 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: ww2w.clenergy.com.au
4.3.2 Fix the rest of East-West
Adjustable
Brackets
on
Girders following the step
4.3.1. Adjust the positions of
all
East-West
Adjustable
Brackets and fasten with M8
Bolts assembly.
Recommend Torque for Bolts
M8:
18~20 N•m
Figure19
4.4 Rail Installation
4.4.1 Before fix TM Rails on
the Support, splice them to the
required length with Splice for
TM Rail.
Insert half of Splice into TM
Rail and fasten with two sets
of Self-tapping screws
ST6.3*22 in each side of TM
Rail, and then insert the other
Splice into TM Rail and fasten
with Self-tapping screws as
shwon in Figure 20.
NOTE: Please fasten the Self-
tapping screw until its rubber
washer attach the TM Rail
tightly.
Figure20