4.2.5 According to engineering
drawing, repeat the above
operations to install other Pre-
assembled Support. Ensure all
the Two-Groove Square
Girders of Pre-assembled
Support are aligned and all
Pre-assembled Support are
parallel to each other. Unlock
M16*50 or M12*100 bolts to
adjust the position, if
necessary, as shown in
Figure14.
Figure17
4.3 East-West Adjustable Bracket Installation
4.3.1 Adjust the East-West
Adjustable Bracket to the
properly position and click the
W Module into the slot of
Girder as shown in Figure 18.
Fasten the M8 Bolts slightly.
Recommend Torque for Bolts
M8:
18~20 N•m
Figure18