background image

 

 

3

 /

18 

No. 999-1009, Min’an Avenue, Xiang’an                                                                                                     1/10 Duerdin , 

Xiamen China 361006                                                                                                                             Clayton VIC 3168 

Tel: +86-592-5781288                                                                                                                      Tel: +61-3-90176688 

Fax: +86-592-5782298                                                                                                                    Fax: +61-3-90176668 

Email: 

[email protected]

                                                                                              Email: 

[email protected]

 

Website: 

www.clenergy.com.cn

                                                                                            Website: ww2w.clenergy.com.au

 

2.2 Components 

Components

 

 

 

 

 

EC-M/OM  

End Clamp 

ICII-M 

Inter Clamp II 

R-TM90/L 

 TM Rail  

SP-LS90/M 

Splice for TM Rail  

 

 

 

 

S-STEco/W 

Support (Pre-

assembled, W shape) 

ER-AA-50/3560/8 

Angle AL    

CO-RT-55/50 

Connector for 

Rectangular Tube  

GS-xx 

Ground Screw 

 

 

 

 

ER-HB-ST16/50A 

Hexagonal Bolt  

M16*50 (with nut and 

washer) 

S-STEco/N 

Support (Pre-

assembled, N shape) 

S-STEco/A 

Support (Pre-
assembled, A 

shape) 

ER-RC II 

Option-Rail Clamp II 

 

 

 

 

BR-TM90/EW 

East-West Adjustable 

Bracket 

 

 

 

Note: There are 3 types of Pre-assembled Support (W/N/A), which are selected according 

to the specific needs of the project. 

Summary of Contents for PV-ezRack SolarTerrace Eco with TM Rail

Page 1: ...dated on 2018 04 PV ezRack SolarTerrace Eco with TM Rail Installation Guide V1 1 NO PZ02A IM03 11 Content 1 Product Introduction 1 2 Tools Components 2 3 System Overview 6 4 Installation Instructions...

Page 2: ...y The manual provides the following content 1 simple introduction of installation 2 product installation specification Please use it according to the installation instruction manual which complies wit...

Page 3: ...www clenergy com cn Website ww2w clenergy com au 2 Tools Components 2 1 Tools Tools Allen Key 6mm M8 Hexagon Socket Screw Socket Wrench M8 M12 Torque Wrench Electric Drill 5m Tape Marker String Total...

Page 4: ...ICII M Inter Clamp II R TM90 L TM Rail SP LS90 M Splice for TM Rail S STEco W Support Pre assembled W shape ER AA 50 3560 8 Angle AL CO RT 55 50 Connector for Rectangular Tube GS xx Ground Screw ER HB...

Page 5: ...l to fasteners prior tightening to avoid galling or seizing in the threads 2 General installation instructions 1 Apply force to fasteners in the direction of thread 2 Apply force uniformly to maintain...

Page 6: ...86 592 5781288 Tel 61 3 90176688 Fax 86 592 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au Notes Tighten th...

Page 7: ...clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 System Overview 3 1 Composition 1 End Clamp with M module 2 Inter Clamp II with M module 3 TM Rail 4 Splice for LS Rail 5 Pr...

Page 8: ...92 5782298 Fax 61 3 90176668 Email sales clenergy com cn Email sales clenergy com au Website www clenergy com cn Website ww2w clenergy com au 3 2 Installation Planning Note Specific size refers to pro...

Page 9: ...information such as piling depth column span etc If you have any questions please contact and consult the customer service 4 1 2 According to the installation planning use Total station or any instrum...

Page 10: ...all aligned 4 2 2 To different engineer there are 3 types of Pre assembled Support W shape Before installation it looks as shown Figure3 Unfold the Rectangular Tubes as shown in Figure 4 Unlock the M...

Page 11: ...au N shape Before installation it looks as shown Figure7 Unfold the Rectangular Tubes as shown in Figure8 Unlock the M12 85 Bolt from the free end Rectangular Tubes and insert it into the Slot U Shape...

Page 12: ...efore installation it looks as shown Figure11 Unfold the Rectangular Tubes as shown in Figure12 Unlock the M12 85 Bolt from the Slot U Shape Joint Insert the free end Rectangular Tube into the Slot U...

Page 13: ...om au 4 2 3 Put the unfolded Pre assembled Support on frank plates of Ground Screws and lock the L anchor Plates with frank plates with M16 bolts The up down adjustable range of Front Rear leg is 20mm...

Page 14: ...ions to install other Pre assembled Support Ensure all the Two Groove Square Girders of Pre assembled Support are aligned and all Pre assembled Support are parallel to each other Unlock M16 50 or M12...

Page 15: ...e positions of all East West Adjustable Brackets and fasten with M8 Bolts assembly Recommend Torque for Bolts M8 18 20 N m Figure19 4 4 Rail Installation 4 4 1 Before fix TM Rails on the Support splic...

Page 16: ...ne lower side of TM Rail on the East West Adjustable Bracket and fasten with Rail Clamp And fasten the other lower side of TM Rail with Rail Clamp as shown in Figure 21 4 4 3 Place the TM Rail one by...

Page 17: ...tly lock Connector for Rectangular Tube on the rear leg of Support as shown in Figure 23 Insert M8 30 through the hole on Angel AL Lightly lock another Connector for Rectangular Tube on the next span...

Page 18: ...tion 4 6 1 Tilt the Clamps with M module and click the lower side of M module into the channel of the Rail first then press the other side of M module into the channel as shown in Figure25 4 6 2 It is...

Page 19: ...pen as shown in the figure26 4 6 3 Fix the rest of PV Module according to the sequence from low to up from left to right Make the side faces of PV Module tightly against Clamps as shown in Figure27 An...

Reviews: