background image

 

 8 / 13 

 

 

 

Clenergy China    

 

 

 

 

 

Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone 

 

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

 

 

 

 

Figure4

 

4.2 Rear Clamp Installation

 

4.2.1  Lock  the  Rear 
Clamp  on  the  support 
leg, and do not lock the 
bolt and nut temporarily, 
for 

the 

Modules 

installation,  the  opening 
directions 

are 

respectively outward, as 
shown  in  Figure  5  and 
Figure 6. 

 

 

Figure 5 

Summary of Contents for PV-ezRack SolarFloating I

Page 1: ...na Telephone 86 592 311 0088 999 1009 Min an Rd Huoju Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn PV ezRack SolarFloating I Instal...

Page 2: ...iate local safety regulations and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The ins...

Page 3: ...areness establish the idea of safety first have a strong sense of responsibility and find timely handling and reporting of safety hazards to ensure smooth construction 2 Tools and Components 2 1 Tools...

Page 4: ...ales clenergy com cn 2 2 Components Components ER SFI MF Main Floater ER SFI AF D Aisle Floater Double ER SFI RS Rear Support Leg ER SFI FS Front Support Leg ER SFI CB Connect Bolt ER SFI CN Connect N...

Page 5: ...lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 3 2 1 Reduce the friction coefficient Ensure that the thread surface is clean no dirt or contaminant Apply lubricant...

Page 6: ...d in engineering drawings As a result major components of the SolarFloating may be provided in sectional sizes and lengths that vary from those shown in this guide The installation operations detailed...

Page 7: ...tion the scaffolding type is adopted and then laying wooden boards or laying the board directly after the shore is flat requires a certain roughness but no sharp protrusion Construction platform size...

Page 8: ...stallation 4 1 1 Place the Main Floater flat on the ground as shown in Figure 1 4 1 2 Insert the Front and Rear Support Leg into the hexagonal mounting hole of the Main Floater as shown in Figure 2 4...

Page 9: ...28 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn Figure4 4 2 Rear Clamp Installation 4 2 1 Lock the Rear Clamp on the support leg and do not lock the bolt and nut temporarily for...

Page 10: ...strict 361101 Xiamen Fujian China sales clenergy com cn Figure 6 4 3 Connect Two Main Floaters 4 3 1 Use one Aisle Floater to connect the two Main Floaters together and lock them with bolts and nuts P...

Page 11: ...n use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and connect the two together as shown in Figure 8 Figure 7 Figure 8 4 4 Peripheral Aisle Floater Installat...

Page 12: ...For each bolt and nut connection point use professional tools to lock the bolts and nuts first and then use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and...

Page 13: ...aining PV Modules Figure 13 is the installation effect of a 1 2 unit Figure 13 4 6 Connect the Floating System and Anchor System 4 6 1 Push the installed Floating System into the water as shown in Fig...

Page 14: ...u Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn according to the actual conditions of the project After tightening the anchor rope f...

Reviews: