torque  of  the  M8  bolt 

should  not  be  too  large, 

and  it  is  better  to  lock 

the  plastic  parts  slightly 

deformed. 

 

4.5.2 Repeat the above 

method to install the 

remaining PV Modules. 

Figure 13 is the 

installation effect of a 

1*2 unit. 

 

 
 

 
 

 
 

 

Figure 13

 

4.6 Connect the Floating System and Anchor System

 

4.6.1 Push the installed 

Floating System into the 

water as shown in 

Figure 14. Use a motor 

boat to pull it to the 

designated location and 

adjust the north-south 

orientation of the 

system. 

 

4.6.2 Fixed the 

Floating 

System

  according  to 

the 

anchoring 

scheme,  as  shown  in 
Fig.  15.  Commonly 
used 

anchoring 

methods  are:  pile 
anchoring  and  anchor 
block  anchoring.  The 
length  of  the  anchor 
rope  is  determined 

 

Figure 14

 

 

Figure 15

 

 

Summary of Contents for PV-ezRack SolarFloating I

Page 1: ...na Telephone 86 592 311 0088 999 1009 Min an Rd Huoju Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn PV ezRack SolarFloating I Instal...

Page 2: ...iate local safety regulations and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The ins...

Page 3: ...areness establish the idea of safety first have a strong sense of responsibility and find timely handling and reporting of safety hazards to ensure smooth construction 2 Tools and Components 2 1 Tools...

Page 4: ...ales clenergy com cn 2 2 Components Components ER SFI MF Main Floater ER SFI AF D Aisle Floater Double ER SFI RS Rear Support Leg ER SFI FS Front Support Leg ER SFI CB Connect Bolt ER SFI CN Connect N...

Page 5: ...lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 3 2 1 Reduce the friction coefficient Ensure that the thread surface is clean no dirt or contaminant Apply lubricant...

Page 6: ...d in engineering drawings As a result major components of the SolarFloating may be provided in sectional sizes and lengths that vary from those shown in this guide The installation operations detailed...

Page 7: ...tion the scaffolding type is adopted and then laying wooden boards or laying the board directly after the shore is flat requires a certain roughness but no sharp protrusion Construction platform size...

Page 8: ...stallation 4 1 1 Place the Main Floater flat on the ground as shown in Figure 1 4 1 2 Insert the Front and Rear Support Leg into the hexagonal mounting hole of the Main Floater as shown in Figure 2 4...

Page 9: ...28 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn Figure4 4 2 Rear Clamp Installation 4 2 1 Lock the Rear Clamp on the support leg and do not lock the bolt and nut temporarily for...

Page 10: ...strict 361101 Xiamen Fujian China sales clenergy com cn Figure 6 4 3 Connect Two Main Floaters 4 3 1 Use one Aisle Floater to connect the two Main Floaters together and lock them with bolts and nuts P...

Page 11: ...n use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and connect the two together as shown in Figure 8 Figure 7 Figure 8 4 4 Peripheral Aisle Floater Installat...

Page 12: ...For each bolt and nut connection point use professional tools to lock the bolts and nuts first and then use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and...

Page 13: ...aining PV Modules Figure 13 is the installation effect of a 1 2 unit Figure 13 4 6 Connect the Floating System and Anchor System 4 6 1 Push the installed Floating System into the water as shown in Fig...

Page 14: ...u Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn according to the actual conditions of the project After tightening the anchor rope f...

Reviews: