background image

 

 5 / 13 

 

 

 

Clenergy China    

 

 

 

 

 

Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone 

 

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

Apply force to fasteners in the direction of thread; 

Apply force uniformly to maintain required torque; 

Avoid using electrical tools for final tightening; 

Avoid working at high temperatures; 

3.2.3 Safe Torques 

Please refer to safe torques defined in this guide. If power tools are required, 

Clenergy recommends the use of low speed only. High speed and impact 

drivers increase the risk of bolt galling (deadlock). If deadlock occurs and you 

need to cut fasteners, please make sure that there is no load on the fastener 

before you cut it. Avoid damaging the anodized or galvanized surfaces. 

 

3.3 Installation Dimensions  

All drawings and dimensions in this installation guide are for generic reference. 

The SolarFloating is to be optimized to suit specific conditions for each project 

and  documented  in  engineering  drawings.  As  a  result,  major  components  of 

the  SolarFloating  may  be  provided  in  sectional  sizes  and  lengths  that  vary 

from  those  shown  in  this  guide.  The  installation  operations  detailed  in  this 

instruction  guide  remain  the  same  regardless  of  the  component  size.  In  case 

any on-site modifications or alteration of the system are needed, in a way that 

would  be  different  from  engineering  drawings,  please  provide  marked  up 

drawings/sketches for Clenergy’s review prior to modification for comment and 

approval. 

 

3.4 Preparation before construction

 

3.4.1 Temporary storage area for Floater 

Stacked  in  the  area  closest  to  the  construction  platform  for  convenient 

secondary  transportation  .The  size  of  the  temporary  stacking  area  is 

considered  in  accordance  with  the  installation  schedule  and  delivery  speed. 

Large-scale  projects  are  recommended  to  have  a  reserve  about  2MW 

(according to a stacking height of 3 meters, approximately 1200 square meters 

of space is required) 

3.4.2 Build the construction platform 

According to the red line position, the arrangement of the floating square array 

and  the  actual  situation  of  the  water  shore,  select  the  location  where  the 

Summary of Contents for PV-ezRack SolarFloating I

Page 1: ...na Telephone 86 592 311 0088 999 1009 Min an Rd Huoju Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn PV ezRack SolarFloating I Instal...

Page 2: ...iate local safety regulations and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The ins...

Page 3: ...areness establish the idea of safety first have a strong sense of responsibility and find timely handling and reporting of safety hazards to ensure smooth construction 2 Tools and Components 2 1 Tools...

Page 4: ...ales clenergy com cn 2 2 Components Components ER SFI MF Main Floater ER SFI AF D Aisle Floater Double ER SFI RS Rear Support Leg ER SFI FS Front Support Leg ER SFI CB Connect Bolt ER SFI CN Connect N...

Page 5: ...lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 3 2 1 Reduce the friction coefficient Ensure that the thread surface is clean no dirt or contaminant Apply lubricant...

Page 6: ...d in engineering drawings As a result major components of the SolarFloating may be provided in sectional sizes and lengths that vary from those shown in this guide The installation operations detailed...

Page 7: ...tion the scaffolding type is adopted and then laying wooden boards or laying the board directly after the shore is flat requires a certain roughness but no sharp protrusion Construction platform size...

Page 8: ...stallation 4 1 1 Place the Main Floater flat on the ground as shown in Figure 1 4 1 2 Insert the Front and Rear Support Leg into the hexagonal mounting hole of the Main Floater as shown in Figure 2 4...

Page 9: ...28 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn Figure4 4 2 Rear Clamp Installation 4 2 1 Lock the Rear Clamp on the support leg and do not lock the bolt and nut temporarily for...

Page 10: ...strict 361101 Xiamen Fujian China sales clenergy com cn Figure 6 4 3 Connect Two Main Floaters 4 3 1 Use one Aisle Floater to connect the two Main Floaters together and lock them with bolts and nuts P...

Page 11: ...n use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and connect the two together as shown in Figure 8 Figure 7 Figure 8 4 4 Peripheral Aisle Floater Installat...

Page 12: ...For each bolt and nut connection point use professional tools to lock the bolts and nuts first and then use the electric drill to drill the Self drilling screw ST6 3 25 through the bolts and nuts and...

Page 13: ...aining PV Modules Figure 13 is the installation effect of a 1 2 unit Figure 13 4 6 Connect the Floating System and Anchor System 4 6 1 Push the installed Floating System into the water as shown in Fig...

Page 14: ...u Hi tech Ind Dev Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn according to the actual conditions of the project After tightening the anchor rope f...

Reviews: