Installation Guide_PV-ezRack_ezShade_AU_V1.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
08
page
of 25
System Overview
⑪
End Cap for Portrait Dry Bar
⑫
T-bolt kit M6*L
⑬
Dry Bar-Portrait
⑭
Cross Connection for Dry Bar
⑮
Dry Bar-Landscape
⑯
End Cap for Dry bar-landscape
⑰
Cap for T-150 Rail (PA6)
⑱
Cap for Composite Beam (PA6)
⑲
Module Clamp 40 mm (in use when Dry bars are not used)
4.2 Precautions during Stainless Steel Fastener Installation
Improper operation may lead to deadlock of Nuts and Bolts. Follow the steps below to reduce this risk.
4.2.1 Reduce the friction coefficient:
①
Ensure that the thread surface is clean (no dirt or contaminants)
②
Apply lubricant (grease or 40# engine oil) to fasteners prior to tightening to avoid galling or seizing
in the threads;
4.2.2 General installation instructions:
①
Apply force to fasteners in the direction of thread;
②
Apply force uniformly, to maintain the required torque;
③
Professional tools and tool belts are recommended;
④
Avoid using electric tools for final tightening;
⑤
Avoid working at high temperatures;
4.2.3 Safe Torques
Please refer to safe torques as shown below. In case power tools are required, Clenergy recommends
the use of low speed only. High speed and impact drivers increase the risk of bolt galling (deadlock).
If deadlock occurs and you need to cut fasteners, please make sure that there is no load on the
fastener before you cut it. Avoid damaging the anodized or galvanized surfaces.