5.1.5 Fix the assembled Main Beam & Rectangular Tube onto Ground/Concrete
Insert the assembled Rectangular Tubes with Main Beams into embedded bolts. Adjust the Trapezoidal U-anchor
Plate to make the lower end faces of all Main Beams aligned in one array as shown in Fig 6, 7and 8. Now fasten
the Trapezoidal U-anchor Plate with M20 Bolts assembly tightly.
Please note that grease must be
applied and tool speed must be
controlled while fastening the bolts.
Recommended Torque:
M20: 200~220 Nm
The up-down adjustable range of
the Front/Rear leg is ±24mm.The
north-south adjustable range of the
Front/Rear leg is ±8mm.
±24mm
±8mm
Fig. 6
Fig. 7
Fig. 8