Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
14
page
of 17
Installation Guide_PV-ezRack ComT V2.0 (September 2020)
Figure 17
Figure 19
Figure 18
Figure 20
Installation Instruction
5.4.4 Insert the Ground Clip (EZ-GC-ST)
between Cable Tray and ECO Rail for each
fixing point, as shown in Figure 17.
Note: when using cutter rail (mill finish
ECO rail), grounding clip is not necessay.
5.4.5 Fasten all M8 bolts with the
recommended toque of 15-17N·m.
Note: Check the electrical resistance
between ECO rail and cable tray to ensure
the bonding is made.
5.4.6 Align and click MT-rail cable tray cover
in as showed in Figure 19.